19
R
ACK VERSION
The sequences of operations to be followed in order to transform the UPS, battery pack or transformer box into rack version
are described below.
BEFORE CARRING OUT THE FOLLOWING SEQUENCE OF OPERATIONS, ENSURE THAT:
THE UPS IS COMPLETELY SWITCHED OFF AND NOT CONNECTED TO THE MAINS POWER
SUPPLY OR TO ANY LOAD.
•
THE BATTERY PACK IS DISCONNECTED FROM THE UPS, FROM ANY OTHER BATTERY
PACKS AND WITH THE BATTERY ISOLATOR OPEN
Pick up the panel from the sides and gently pull it away from its position just enough to be able to rotate it: ATTENTION:
The panel must be moved carefully
DO NOT ATTEMPT IN ANY WAY TO REMOVE THE PANEL FROM THE UPS
Rotate the panel 90° counter clockwise and reinsert it carefully into the special housing.
At this point, with the UPS, Battery Pack or Transformer Box in the horizontal position, secure the handles using the
screws provided, as shown in the figure.
NOTE:
Given the heavy weight, the use of support brackets is
mandatory during rack installation (guide with L-shaped support).
For the same reason, it is recommended that the UPS, Battery
Pack and Transformer Box are installed in the lower part of the
rack cabinet.
Содержание Sentinel RT 10000 VA ER
Страница 1: ...User Operations Manual Sentinel RT True Online UPS System 6000 VA 6000 VA ER 10000 VA 10000 VA ER ...
Страница 2: ......
Страница 41: ......
Страница 42: ...0MLSDH6K0RUENUA ...