44
Sirius-PJ1Training
Slide 44
Replacing the Main PWB
Before replacing the main board, copy all data from the current Main PWB
to your PC (service adjustment software is required: TBA.exe – see
Software Required for Service earlier in the presentation).
If this process failed, then some steps of the data writing process have to
be skipped, as shown below.
Do the following after replacing the Main PWB (software is required – see
Software Required for Service earlier in the presentation):
Data writing
» Data for each model
» EDID Data
» Serial number and Model number
Data Read/Write (skip this part if the data could not be copied from the old
Main Board)
» Flicker Data
» VT Data
» Uniformity Data
» Color Correction Data
» Multi Data
» Usage Time Data
Flicker adjustment (do this if the data could not be copied from the old
Main Board)
Usage Time setup (do this if the data could not be copied from the old
Main Board)
Adjustment Procedures: Service manual > Electrical Adjustment
We will look at these adjustments and how to use the software later.
Service adjustment software: TBA.exe – the name of this software is not decided
yet.