background image

Series GUT/F 

Page 

7

 

 
 

9530-021-en 

Revision 16 

TM 10477

 

Edition    05/2022 

 

Safety note for valves, certified to Clean Air Act (TA-Luft) 

Certificate  /  Manufacturer  Declaration  Validity  is 
dependent  on  the  operating  instructions  being  read 
and observed.  

  Carry out regular maintenance intervals and check 

the tightness of the screw connections and tighten 
as necessary. 

 
 
 
 
 

Transport, storage and disposal 

 

For  all  transport  work,  observe  generally 
accepted  engineering  practice  and  the 
accident prevention regulations. 

 

 

 

The  overflow  valve  is  supplied  with  flange 
caps.  They  protect  the  plastic  surfaces 
against dirt and mechanical damage. Do not 
remove them until just before installation. 

Handle the goods being transported with care. During 
transport  protect  the  valve  against  impacts  and 
collisions. 

Transport the valve upright in a box or on a pallet on a 
soft surface and deposit gently on flat ground. 

Directly after receipt of the goods, check the consign-
ment for completeness and any in-transit damage. 

Do not damage paint protection. 
 
 

 

5.1  Storage 

If  the  valve  is  not installed  immediately  after  delivery, 
store them properly. 

It  should  be  stored  in  a  dry,  vibration-free  and  well-
ventilated  room  at  as  constant  a  temperature  as 
possible.  

In general, a storage period of 10 years should not be 
exceeded. 

Store  the  valve  in  an  upright  position  and  secure  it 
from falling over!  
In case of prolonged storage individual packing with a 
desiccant  may  be  necessary.  Pay  attention  to  local 
site. 
 

 
 

5.2  Return consignments 

 

Valves  which  have  conveyed  aggressive  or 
toxic  media  rinse  and  clean  before  being 
returned to the manufacturer's works. 

It  is 

imperative

  to  enclose  a 

safety  information 

sheet  /  general  safety  certificate

  on  the  field  of 

application with the return consignment. 

Pre-printed  forms  are  enclosed  with  the  installation 
and operating manual. 

Safety  precautions  and  decontamination  measures 
are to be mentioned. 
 
 

5.3  Disposal  

Parts of the valve may be contaminated with medium 
which  is  detrimental  to  health  and  the  environment 
and therefore cleaning is not sufficient. 

 

 

Risk  of  personal  injury  or  damage  to  the 
environment due to the medium! 

 

  Wear  protective  clothing  when  work  is  performed 

on the valve. 

  Prior to the disposal of the valve: 

  Collect  any  medium,  etc.  which  has  escaped 

and  dispose  of  it  in  accordance  with  the  local 
regulations. 

  Neutralise any medium residues in the valve. 

  Separate  valve  materials  (plastics,  metals,  etc.) 

and  dispose  of  them  in  accordance  with  the  local 
regulations. 

 

Содержание GUT/F Series

Страница 1: ...erved before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9530 021 en...

Страница 2: ...ion forces 9 6 3 Valve connecting dimensions 9 6 4 Flange caps and gaskets 9 6 5 Direction of flow and installation position 9 6 6 Grounding 9 6 7 Installation 9 7 Operation 10 7 1 Initial commissioni...

Страница 3: ...300 raised face Materials Body material Ductile cast iron EN JS 1049 ASTM A395 Lining material PFA PTFE F On request antistatic PFA L F L highly permeation resistant F P Ultrapure PFA HP F HP Bellows...

Страница 4: ...o ASME Class 300 Flange Nominal size screws Tightening torque mm inch ASME Nm in lbs 25 1 4 x 15 133 Cover screws ISO DIN Flange Nominal size screws Tightening torque mm inch ISO DIN Nm in lbs 25 1 4...

Страница 5: ...ve a corrosion resistant plastic lining Solids can lead to increased wear damage to sealing surfaces or to a reduction in the service life of the valve The overflow valves are set at the works to the...

Страница 6: ...the valve must be completely filled with medium at all times or else a potentially explosive atmosphere must be excluded by superimposing a layer of inert gas b Discharges outside the valve At the poi...

Страница 7: ...a dry vibration free and well ventilated room at as constant a temperature as possible In general a storage period of 10 years should not be exceeded Store the valve in an upright position and secure...

Страница 8: ...s of flow 6 2 Sizing of the outlet line Outlet lines are to be sized so that reliable functioning of the valve is ensured under all expected operating conditions The medium is to be discharged so that...

Страница 9: ...e of metal or enamel can be damaged use PTFE lined seals with a metal inlay These gaskets are available as special accessories in the Richter range 6 5 Direction of flow and installation position Qqq...

Страница 10: ...ssioning When recommissioning the valve make sure that all the appropriate steps as described in Section 6 1 to 6 7 and Section 7 1 are repeated 7 4 Improper operation and their consequences Fig 7 The...

Страница 11: ...re vessels VBG 17 32 and TRD 601 sheet 2 paragraph 3 4 The intervals for regular checks are to be laid down by the customer in line with the operating conditions All repair work is to be performed by...

Страница 12: ...plug and seat Unscrew cap 207 Undo groove nut 509 1 Undo straining screw 581 Do not turn the entire stem 800 There is a risk of the insert sleeve 308 being unscrewed out of the bellows 206 or the fold...

Страница 13: ...ciation of the German Technical Supervi sory Boards All pressure tests should be carried out in compliance with DIN EN 12266 1 or API 527 It is recommended to perform a bubble test with a 5 mm diamete...

Страница 14: ...Series GUT F Page 14 9530 021 en Revision 16 TM 10477 Edition 05 2022 10 2 Sectional drawing...

Страница 15: ...EN 1092 2 type B ISO 7005 2 Type B PN 16 or flanges drilled to ASME B16 5 Class 150 Flanges acc to ASME B16 5 Class 150 or 300 raised face Nominal size EN 558 series 1 ANSI ISA 75 08 01 Class 150 ANSI...

Страница 16: ......

Страница 17: ......

Страница 18: ...om T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La S 10 4 mg s...

Страница 19: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 20: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 21: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 22: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: