background image

Series GUT/F 

Page 

8

 

 
 

9530-021-en 

Revision 16 

TM 10477

 

Edition    05/2022 

Installation 

The  installation  conditions  to  the  AD  2000  Code 
A2  are  to  be  observed.  They  are  major  precondi-
tions for the safe operation of the valve. 

  Examine  valve  for  in-transit  damage,  damaged 

overflow and pressure relief valves do not install. 

  Before  installation  the  valve  and  the  connecting 

pipe must be carefully cleaned to remove any dirt, 
especially hard foreign matter. 

  During  installation,  pay  attention  to  the  correct 

tightening  torque,  aligned  pipes  and  tension-free 
assembly. 

 
 

6.1  Sizing of the intlet line 

 

The admissible pressure loss in the inlet line 
must  not  exceed  3%  of  the  set  pressure  of 
the overflow valve.  

The  determination  of  the  pressure  loss  relates  to  the 
maximum  flow  of  the  valve  at  110%  of  the  set 
pressure. 

  An  excessive  pressure  loss  at  the  inlet  of  the 

overflow  valve  can  cause  rapid  opening  and  re-
seating of the valve or chattering.  

  Chattering  results  in  a  reduction  in  the  discharge 

capacity  and  may  cause  an  inadmissible  rise  in 
pressure  in  the  system  and  damage  to  the  seat 
sealing surfaces. 

 

The  inlet  line  must  never  be  smaller  than  the 
nominal diameter of the overflow valve inlet. 

  Lay supply lines as short as possible.  

  Install,  if  at  all  possible,  the  valve  directly  on  the 

container to be protected.  

  At least chamfer the container nozzle in the inlet or 

even better provide with a radius. 

  An inlet nozzle with a tapered design has the best 

shape in terms of flow. 

 
 

6.2  Sizing of the outlet line 

Outlet lines are to be sized so that reliable functioning 
of  the  valve  is  ensured  under  all  expected  operating 
conditions.  
The  medium  is  to  be  discharged  so  that  there  is  no 
risk  to  people  and  the  environment.  The  statutory 
provisions  (e.g.  accident  prevention  regulations,  and 
the equivalents of the German Pollution Control Act or 
the  German  Clean  Air  Code)  as  well  as  local 
regulations (works standards) are to be observed.  

  There must be no possibility of the overflow valves 

becoming ineffective due to shut-off elements. 

 

6.2.1  Admissible back pressure 

 

The  outlet  line  must  never  be  smaller  than  the 
nominal diameter of the overflow valve outlet.  

  The  admissible  back  pressure  in  the  valve  outlet 

must not be exceeded  in order to prevent destruc-
tion  of  the  bellows  or  a  reduction  in  the  discharge 
capacity. 

The  Pressure-temperature-diagram  in 

Section  1.4

 

contain information of the manufacturer on admissible 
back pressures. 
 
 

6.2.2  Drainage of condensate 

Lay  horizontal  pipes  with  a  gradient  away  from  the 
valve  so that the liquid medium cannot accumulate in 
the  valve  body  and  that,  in  the  case  of  gases,  no 
condensate collects in the body. 

If  outlet  lines  are  laid  with  a  geodetic  level  difference 
(e.g.  for  vapours  or  gases  with  a  90°  vertical  upright 
pipe  bend  out  of  the  valve),  the  bend  must  not  be 
located directly downstream of the valve. 

wrong 

 

 

Fig. 3

 

A  horizontal  pipe  section  with  a  gradient  must  firstly 
be installed downstream of the valve. 

A draining facility must be provided at the lowest point 
in  the  pipe.  This  opening  for  the  drainage  of  conden-
sate must be lower than the flow chamber of the body. 

right 

  Fig. 4

 

Содержание GUT/F Series

Страница 1: ...erved before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9530 021 en...

Страница 2: ...ion forces 9 6 3 Valve connecting dimensions 9 6 4 Flange caps and gaskets 9 6 5 Direction of flow and installation position 9 6 6 Grounding 9 6 7 Installation 9 7 Operation 10 7 1 Initial commissioni...

Страница 3: ...300 raised face Materials Body material Ductile cast iron EN JS 1049 ASTM A395 Lining material PFA PTFE F On request antistatic PFA L F L highly permeation resistant F P Ultrapure PFA HP F HP Bellows...

Страница 4: ...o ASME Class 300 Flange Nominal size screws Tightening torque mm inch ASME Nm in lbs 25 1 4 x 15 133 Cover screws ISO DIN Flange Nominal size screws Tightening torque mm inch ISO DIN Nm in lbs 25 1 4...

Страница 5: ...ve a corrosion resistant plastic lining Solids can lead to increased wear damage to sealing surfaces or to a reduction in the service life of the valve The overflow valves are set at the works to the...

Страница 6: ...the valve must be completely filled with medium at all times or else a potentially explosive atmosphere must be excluded by superimposing a layer of inert gas b Discharges outside the valve At the poi...

Страница 7: ...a dry vibration free and well ventilated room at as constant a temperature as possible In general a storage period of 10 years should not be exceeded Store the valve in an upright position and secure...

Страница 8: ...s of flow 6 2 Sizing of the outlet line Outlet lines are to be sized so that reliable functioning of the valve is ensured under all expected operating conditions The medium is to be discharged so that...

Страница 9: ...e of metal or enamel can be damaged use PTFE lined seals with a metal inlay These gaskets are available as special accessories in the Richter range 6 5 Direction of flow and installation position Qqq...

Страница 10: ...ssioning When recommissioning the valve make sure that all the appropriate steps as described in Section 6 1 to 6 7 and Section 7 1 are repeated 7 4 Improper operation and their consequences Fig 7 The...

Страница 11: ...re vessels VBG 17 32 and TRD 601 sheet 2 paragraph 3 4 The intervals for regular checks are to be laid down by the customer in line with the operating conditions All repair work is to be performed by...

Страница 12: ...plug and seat Unscrew cap 207 Undo groove nut 509 1 Undo straining screw 581 Do not turn the entire stem 800 There is a risk of the insert sleeve 308 being unscrewed out of the bellows 206 or the fold...

Страница 13: ...ciation of the German Technical Supervi sory Boards All pressure tests should be carried out in compliance with DIN EN 12266 1 or API 527 It is recommended to perform a bubble test with a 5 mm diamete...

Страница 14: ...Series GUT F Page 14 9530 021 en Revision 16 TM 10477 Edition 05 2022 10 2 Sectional drawing...

Страница 15: ...EN 1092 2 type B ISO 7005 2 Type B PN 16 or flanges drilled to ASME B16 5 Class 150 Flanges acc to ASME B16 5 Class 150 or 300 raised face Nominal size EN 558 series 1 ANSI ISA 75 08 01 Class 150 ANSI...

Страница 16: ......

Страница 17: ......

Страница 18: ...om T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La S 10 4 mg s...

Страница 19: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 20: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 21: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 22: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: