9.4  Adjustment of the test pres-

sure 

  Unscrew cap 

207

  Undo groove nut 

509/1

  Adjust  the  spring  tension  with  the  straining  screw 

581

 to the specified test pressure. 

  Counter  straining  screw 

581 

with  the  groove  nut 

509/1

  

  Check test pressure. 

  Screw on cap 

207

 and tighten. 

  Have valve lead-sealed. 

  The data specified in the test certificates are to be 

observed. 

 
 

9.5  Important notes on disman-

tling / installation 

 

 

First undo the straining screw 

581

; the valve 

plug 

204 

is relieved!  

 

  Then  undo  the  screws  between  cover  flange 

105

 

and body 

100

.   

  The  seat  and  plug  could  otherwise  be  destroyed. 

Read the precise instructions in 

Section 9.6

  Always  replace  the  seat  and  plug  pairwise  and 

always rework them completely. 

  Reworking  of  the  seat  and  plug  requires  special-

ised knowledge.  

  It  is  therefore  recommended  to  have  this  work 

carried out by the manufacturer. 

  After  dismantling,  check  all  parts  for  wear  and 

damage.  

  Observe sectional drawings in 

Section 10

 
 

9.6  Replacement of components 

 

 

Fig. 8 

 

 

9.6.1  Dismantling of the plug and seat 

  Unscrew cap 

207

  Undo groove nut 

509/1

  Undo straining screw 

581

  Do not turn the entire stem 

800

! There is  a risk of 

the  insert  sleeve 

308

  being  unscrewed  out  of  the 

bellows 

206

 or the folds being damaged!  

  Loosen  the  bolts 

901/1

936/1

936/2

  and 

920/1

 

from  body 

100 

and  cover  flange 

105

  and  lift  the 

cover flange with internals completely off. 

  Grip  the  bellows 

206

  in  the  reinforced  section. 

Unscrew and remove the plug 

204

  Unscrew seat 

205

 from the body 

100

 with a special 

wrench. See 

Section 1.3

.  

 
 

9.6.2  Installation of seat and plug 

  The  new  seat  is  to  be  carefully  protected  prior  to 

assembly.  The  sealing  edge  and  the  sealing  sur-
face for the plug must not be damaged. See 

Fig. 8.

 

  All  parts  are  to  be  thoroughly  cleaned  before 

assembly. 

  Screw new or reworked seat 

205 

into the body 

100 

with a screwdriver. 

  Screw new or reworked plug 

204 

onto the bellows 

thread hand-tight. 

  Hold the bellows 

206 

at the reinforced section. 

  First  tighten  the  attachment  nuts 

920/1

  hand-tight 

and  then  with  a  torque  wrench  evenly  and  in 
diametrically opposite sequence. 

  Adjust  the  spring  tension  with  the  straining  screw 

581

 to the specified test pressure. 

  Counter  straining  screw 

581 

with  the  groove  nut 

509/1

  

  Check test pressure. 

  Screw on cap 

207

 and tighten. 

  Have valve lead-sealed. 

 
 

Содержание GUT/F Series

Страница 1: ...erved before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH 9530 021 en...

Страница 2: ...ion forces 9 6 3 Valve connecting dimensions 9 6 4 Flange caps and gaskets 9 6 5 Direction of flow and installation position 9 6 6 Grounding 9 6 7 Installation 9 7 Operation 10 7 1 Initial commissioni...

Страница 3: ...300 raised face Materials Body material Ductile cast iron EN JS 1049 ASTM A395 Lining material PFA PTFE F On request antistatic PFA L F L highly permeation resistant F P Ultrapure PFA HP F HP Bellows...

Страница 4: ...o ASME Class 300 Flange Nominal size screws Tightening torque mm inch ASME Nm in lbs 25 1 4 x 15 133 Cover screws ISO DIN Flange Nominal size screws Tightening torque mm inch ISO DIN Nm in lbs 25 1 4...

Страница 5: ...ve a corrosion resistant plastic lining Solids can lead to increased wear damage to sealing surfaces or to a reduction in the service life of the valve The overflow valves are set at the works to the...

Страница 6: ...the valve must be completely filled with medium at all times or else a potentially explosive atmosphere must be excluded by superimposing a layer of inert gas b Discharges outside the valve At the poi...

Страница 7: ...a dry vibration free and well ventilated room at as constant a temperature as possible In general a storage period of 10 years should not be exceeded Store the valve in an upright position and secure...

Страница 8: ...s of flow 6 2 Sizing of the outlet line Outlet lines are to be sized so that reliable functioning of the valve is ensured under all expected operating conditions The medium is to be discharged so that...

Страница 9: ...e of metal or enamel can be damaged use PTFE lined seals with a metal inlay These gaskets are available as special accessories in the Richter range 6 5 Direction of flow and installation position Qqq...

Страница 10: ...ssioning When recommissioning the valve make sure that all the appropriate steps as described in Section 6 1 to 6 7 and Section 7 1 are repeated 7 4 Improper operation and their consequences Fig 7 The...

Страница 11: ...re vessels VBG 17 32 and TRD 601 sheet 2 paragraph 3 4 The intervals for regular checks are to be laid down by the customer in line with the operating conditions All repair work is to be performed by...

Страница 12: ...plug and seat Unscrew cap 207 Undo groove nut 509 1 Undo straining screw 581 Do not turn the entire stem 800 There is a risk of the insert sleeve 308 being unscrewed out of the bellows 206 or the fold...

Страница 13: ...ciation of the German Technical Supervi sory Boards All pressure tests should be carried out in compliance with DIN EN 12266 1 or API 527 It is recommended to perform a bubble test with a 5 mm diamete...

Страница 14: ...Series GUT F Page 14 9530 021 en Revision 16 TM 10477 Edition 05 2022 10 2 Sectional drawing...

Страница 15: ...EN 1092 2 type B ISO 7005 2 Type B PN 16 or flanges drilled to ASME B16 5 Class 150 Flanges acc to ASME B16 5 Class 150 or 300 raised face Nominal size EN 558 series 1 ANSI ISA 75 08 01 Class 150 ANSI...

Страница 16: ......

Страница 17: ......

Страница 18: ...om T V S d Industrie Service GmbH Voraussetzung f r die G ltigkeit der Herstellererkl rung ist das Beachten und Einhalten der Betriebsanleitung meet the requirement of the leakage rate La S 10 4 mg s...

Страница 19: ...ls The laws are such as the Health and Safety at Work Act ArbSt ttV the Ordinance on Harzadous Substances GefStoffV BIOSTOFFV the procedures for the prevention of accidents as well as regulations to e...

Страница 20: ...tamination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the r...

Страница 21: ...ch cleaning method radioactive3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with documented evidence of...

Страница 22: ...ai Info idexcorp com Internet www richter ct com Richter Pumps Valves Inc 406 State Street Cedar Falls 50613 IA USA Tel 1 319 268 8038 Fax 1 319 273 8157 Email RichterCedarFalls Info idexcorp com Inte...

Отзывы: