3
IMPORTANT: TO INSURE PROPER INSTALLATION AND OPERATION OF
THIS PRODUCT, COMPLETELY READ ALL INSTRUCTIONS PRIOR TO
ATTEMPTING TO ASSEMBLE, INSTALL, OPERATE, MAINTAIN OR REPAIR
THIS PRODUCT. UPON UNPACKING OF THE FURNACE, INSPECT ALL
PARTS FOR DAMAGE PRIOR TO INSTALLATION AND START-UP.
CONTENTS
Safety Precautions ...................................................................................................1
Installation Check List ..............................................................................................2
Location Requirements and Considerations ............................................................4
Combustion and Ventilation Air ..............................................................................10
Vent Pipe Installation..............................................................................................13
Gas Supply and Piping...........................................................................................16
Electrical Wiring......................................................................................................19
Accessories ............................................................................................................20
Air Flow...................................................................................................................26
Maintenance...........................................................................................................29
Troubleshooting......................................................................................................31
Wiring Diagram.......................................................................................................33
➤
Installation Instructions are updated on a regular basis. This is done as
product changes occur or if new information becomes available. In this
publication, an arrow (
➤
) denotes changes from the previous edition or additional
new material.
Содержание 1x2000
Страница 20: ...20 FIGURE 16 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION SINGLE STAGE OPERATION I685 ...
Страница 21: ...21 FIGURE 17 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION I684 ...
Страница 29: ...29 FIGURE 25 FILTER RETAINING RODS SIDE RETURN FIGURE 26 DOWNFLOW FILTER INSTALLATION ...
Страница 31: ... FIGURE 27 INTEGRATED FURNACE CONTROL IFC TROUBLESHOOTING GUIDE FOR UTEC 1095 101 31 ...
Страница 32: ...32 ...
Страница 33: ... FIGURE 28 UTEC 1095 101 INTEGRATED FURNACE CONTROL 33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 36: ...36 CM 599 Rheem Manufacturing Company Air Conditioning Division Fort Smith Arkansas ...