Before beginning any troubleshooting procedure, complete the following installation checklist. A furnace malfunction is
sometimes caused by an improper installation. By completing this checklist, the problem may be found and corrected. Make
copies of the checklist and complete one for every Low Profile Furnace service call for your records.
INSTALLATION CHECKLIST
(Refer to this manual for specifics.)
GAS SUPPLY
Adequate pipe size
No gas leaks
Proper supply and manifold gas pressure (check with an accurate U-tube manometer with the furnace and all other gas
appliances operating.)
ELECTRICAL
Correct thermostat and subbase
Thermostat model
Subbase model
Correct thermostat mode and setting
Correct line supply voltage
Correct polarity (important with hot surface ignition)
Correct furnace ground to electrical panel
DC microamp (
µ
A) flame signal (hot surface ignition units)
Correct control voltage
Measure and set heat anticipator amperage
Air conditioning low voltage wires connected to terminals “Y” “C” - not with wire nuts
VENTING
Correct vent pipe diameter and length (according to AGA/GAMA tables)
Vent connection size
Correct venting material (according to AGA/GAMA tables)
Correct lining for masonry chimneys
Adequate clearance from combustibles
Proper negative pressure reading in the vent
Vent pipe secured to induced draft blower housing
COMBUSTION AIR
Proper source of combustion air
Correct combustion air opening size
FURNACE INSTALLATION
Adequate clearance from combustibles
Adequate clearance for service
Proper air temperature rise (See furnace rating plate)
External static pressure
inches w.c.
Correct filter(s)
Correct cooling coil or accessories (if equipped)
Adequate supply and return air ducting
Return Air Duct Size
Supply Air Duct Size
Air ducts sealed to prevent leakage
Содержание 1x2000
Страница 20: ...20 FIGURE 16 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION SINGLE STAGE OPERATION I685 ...
Страница 21: ...21 FIGURE 17 UTEC NO 1095 100 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION I684 ...
Страница 29: ...29 FIGURE 25 FILTER RETAINING RODS SIDE RETURN FIGURE 26 DOWNFLOW FILTER INSTALLATION ...
Страница 31: ... FIGURE 27 INTEGRATED FURNACE CONTROL IFC TROUBLESHOOTING GUIDE FOR UTEC 1095 101 31 ...
Страница 32: ...32 ...
Страница 33: ... FIGURE 28 UTEC 1095 101 INTEGRATED FURNACE CONTROL 33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 36: ...36 CM 599 Rheem Manufacturing Company Air Conditioning Division Fort Smith Arkansas ...