Feb 25/11
7 - 6
9105
2.
PREPARATION OF COATED SURFACES
Polyurethane-proofed surfaces
Caution:
VERY IMPORTANT – The heavy duty polyurethane coating on the material
used for the buoyancy chambers/floor must have the surface
contamination completely removed by thoroughly cleaning the coated
surfaces with solvent MEK (Methyl Ethyl Ketone). Petroleum or Toluene
type cleaning solvents are ineffective on this material and must not be
used.
A.
The nylon fabric (Part No. 302-001) used for the buoyancy chamber/floor has a heavy duty
polyurethane coating which has been compounded to give a high resistance to abrasion.
B.
These polyurethane coated fabrics must be prepared for bonding by thoroughly cleaning the
coated surfaces with the solvent MEK immediately before application of the first coat of
adhesive. The solvent is applied with a lint-free fabric pad, wet but not dripping with the
solvent. Adequate preparation is shown by the development of a matte appearance and a
limited degree of tackiness.
C.
After being wiped with MEK, the receptiveness of polyurethane surfaces and
polychloroprene adhesives lessens rapidly. For best results the adhesives must be applied
within 10-20 seconds of the MEK wipe, which should be made at standard room
temperature. The optimum time within which the adhesive must be applied, at any given
temperature, can be found using the experience gained by experimenting with identical
fabrics.
D.
Repeated applications of the MEK solvent on a clean polyurethane surface tend to become
less effective. Apply the first coat of adhesive immediately after the first MEK wipe.
E.
Surfaces which have been separated should not have the residual adhesive removed unless
it can be easily peeled off.
Note:
Surfaces which have previously had a solution applied will not normally
respond well to MEK solvent.
Содержание 45-AC2V
Страница 1: ......
Страница 2: ......
Страница 4: ...Feb 25 11 RR 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ...Feb 25 11 SB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ......
Страница 16: ...Feb 25 11 EP 4 9105 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 17: ...LIST OF ASSOCIATED PUBLICATIONS Feb 25 11 9105 AP 1 AP None Listed...
Страница 18: ...Feb 25 11 AP 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 20: ...Feb 25 11 AB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...Feb 25 11 TC 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...Feb 25 11 1 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ...Feb 25 11 2 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...FIGURE 1 AERO COMPACT 4 person capacity shown Description comparable to 2 person capacity Feb 25 11 2 4 9105...
Страница 34: ...FIGURE 2 VALISE Feb 25 11 2 8 9105...
Страница 35: ...FIGURE 3 GAS INFLATION SYSTEM Feb 25 11 9105 2 9...
Страница 38: ...FIGURE 4 RAFT DIMENSIONS Feb 25 11 2 12 9105...
Страница 40: ...FIGURE 5 DEPLOYMENT Feb 25 11 2 14 9105...
Страница 41: ...FIGURE 6 CANOPY ATTACHMENT Feb 25 11 9105 2 15...
Страница 42: ...Feb 25 11 2 16 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 43: ...DISASSEMBLY Feb 25 11 9105 3 1 3 General 3 Procedures 5...
Страница 44: ...Feb 25 11 3 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...Feb 25 11 3 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 49: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Feb 25 11 9105 3 7...
Страница 50: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Feb 25 11 3 8 9105...
Страница 52: ...Feb 25 11 4 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...Feb 25 11 4 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 56: ...Feb 25 11 4 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 58: ...Feb 25 11 4 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 63: ...FIGURE 1 DIGITAL MANOMETER Feb 25 11 9105 4 13...
Страница 69: ...CLEANING Feb 25 11 9105 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 70: ...Feb 25 11 5 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 72: ...Feb 25 11 5 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 74: ...Feb 25 11 5 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 75: ...SERVICE INSPECTION AND CHECK Feb 25 11 9105 6 1 6 General 3 Gas Inflation System s 5 Valise Pack 7...
Страница 76: ...Feb 25 11 6 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 78: ...Feb 25 11 6 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 80: ...Feb 25 11 6 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 82: ...Feb 25 11 6 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...Feb 25 11 7 2 9105 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 86: ...Feb 25 11 7 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 93: ...FIGURE 1 PATCHES AND TAPE APPLICATION Feb 25 11 9105 7 11...
Страница 94: ...FIGURE 2 PATCH APPLICATION OVER SEAM Feb 25 11 7 12 9105...
Страница 96: ...Feb 25 11 7 14 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...Feb 25 11 8 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...Feb 25 11 8 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 103: ...Feb 25 11 9105 8 7 FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION...
Страница 104: ...FIGURE 2E PREPARING LIGHT Feb 25 11 8 8 9105 FIGURE 2F INFLATION VALVE CYLINDER PREPARATION...
Страница 119: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE Feb 25 11 9105 8 23 FIGURE 4 ATTACHING THE CYLINDER...
Страница 120: ...FIGURE 5 STORAGE OF COMPONENTS Feb 25 11 8 24 9105...
Страница 122: ...FIGURE 6B AC2V FOLDING DIAGRAM STEP 2 Feb 25 11 8 26 9105...
Страница 123: ...FIGURE 6C AC2V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 27...
Страница 124: ...FIGURE 6D AC2V FOLDING DIAGRAM STEP 4 Feb 25 11 8 28 9105 FIGURE 6E AC2V FOLDING DIAGRAM STEP 5...
Страница 125: ...FIGURE 6F AC2V FOLDING DIAGRAM STEP 6 Feb 25 11 9105 8 29 FIGURE 6G AC2V FOLDING DIAGRAM STEP 7...
Страница 126: ...FIGURE 6H AC2V FOLDING DIAGRAM CC4 STEP 8 Feb 25 11 8 30 9105...
Страница 127: ...FIGURE 7A AC4V FOLDING DIAGRAM STEP 1 Feb 25 11 9105 8 31...
Страница 128: ...FIGURE 7B AC4V FOLDING DIAGRAM STEP 2 Feb 25 11 8 32 9105...
Страница 129: ...FIGURE 7C AC4V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 33...
Страница 130: ...FIGURE 7D AC4V FOLDING DIAGRAM STEP 4 Feb 25 11 8 34 9105...
Страница 131: ...FIGURE 7E AC4V FOLDING DIAGRAM STEP 5 Feb 25 11 9105 8 35...
Страница 132: ...FIGURE 7F AC4V FOLDING DIAGRAM STEP 6 Feb 25 11 8 36 9105...
Страница 133: ...FIGURE 7G AC4V FOLDING DIAGRAM STEP 7 Feb 25 11 9105 8 37...
Страница 134: ...FIGURE 7H AC4V FOLDING DIAGRAM STEP 8 Feb 25 11 8 38 9105 FIGURE 7I AC4V FOLDING DIAGRAM STEP 9...
Страница 135: ...FIGURE 7J CC6 FOLDING DIAGRAM STEP 10 Feb 25 11 9105 8 39 FIGURE 7K AC4V FOLDING DIAGRAM STEP 11...
Страница 136: ...FIGURE 7L CC6 FOLDING DIAGRAM STEP 12 Feb 25 11 8 40 9105...
Страница 137: ...FIGURE 8 PAINTERLINE LOOPS Feb 25 11 9105 8 41 FIGURE 9 ATTACHMENT OF CYLINDER NECK LOOP...
Страница 138: ...FIGURE 10 ATTACHMENT OF CABLE LOOP Feb 25 11 8 42 9105...
Страница 139: ...FIGURE 11 ATTACHMENT OF PAINTERLINE SACHET Feb 25 11 9105 8 43 DETAIL A ATTACHMENT OF PAINTERLINE LOOP...
Страница 140: ...Feb 25 11 8 44 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 143: ...Feb 25 11 9105 8 47 Standard Kit Pack...
Страница 144: ...Feb 25 11 8 48 9105 Standard Plus Kit Pack...
Страница 145: ...Feb 25 11 9105 8 49 Deluxe Kit Pack...
Страница 146: ...Feb 25 11 8 50 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 147: ...STORAGE Feb 25 11 9105 9 1 9 General 3 s...
Страница 148: ...Feb 25 11 9 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 150: ...Feb 25 11 9 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 151: ...TOOL EQUIPMENT AND MATERIALS Feb 25 11 9105 10 1 10 General 3 Breakdown 5...
Страница 152: ...Feb 25 11 10 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 154: ...Feb 25 11 10 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 158: ...Feb 25 11 10 8 9105 Quick Disconnect Valve Charging Stem Part 338 005 Quick Disconnect Valve Charging Body Part 338 006...
Страница 160: ...Feb 25 11 11 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...Feb 25 11 11 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 25 11 11 10 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FIGURE 1 LIFE RAFT ASSEMBLY Feb 25 11 11 12 9105...
Страница 173: ...Feb 25 11 9105 11 15 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...FIGURE 2 HULL ASSEMBLY Feb 25 11 11 16 9105...
Страница 176: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Feb 25 11 11 18 9105...
Страница 178: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Feb 25 11 11 20 9105...
Страница 180: ...Feb 25 11 11 22 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 186: ...Feb 25 11 9105 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 188: ......