background image

 

 
 

NUMERICAL PARTS LIST 

 

 

 

Feb 25/11 

9105

 

 

 

  

11 - 7

 

 
 

No equivalent substitutes are to be used for listed items without the prior written consent of Revere 

Supply Co., Inc.  Revere Supply Co., Inc. will not accept responsibility for any equipment malfunction 

where unauthorized substitutions have been used. 

 

The Numerical Index is an alpha-numeric list of all part numbers included in the Detailed Parts List. 

 

Each part number is followed by the applicable FIG-ITEM number.  When a part number is referenced 

in more than one Figure, both FIG-ITEM numbers are listed in the column.  The part number is not 

repeated in the list.  
 

The UNITS column reflects the total quantity for each FIG-ITEM listed.  “AR” means “as required” and 

refers to quantities of bulk items.  Items listed for reference purposes bear the letters “RF”, which 

indicates a “reference item”. 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание 45-AC2V

Страница 1: ......

Страница 2: ......

Страница 3: ...ision No and Revision Date Remove the old sheet and replace it with the revised copy Record the Insert Date and then initial in the Inserted By column Revisions made ONLY by Revere Supply Inc REV No R...

Страница 4: ...Feb 25 11 RR 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 5: ...All service bulletins which are incorporated into this manual are required to be recorded in this list All updates to this list will be made by the owner of the manual SERVICE BULLETIN No DATE TITLE D...

Страница 6: ...Feb 25 11 SB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 7: ...30 Revere P N 95 326 009 Inlet Check Valve Mirada B 51994 Revere P N 95 325 005 3 8 18NPSM Universal Flange PU Mirada B 51073 Revere P N 95 326 001 As a result of the inlet check valve replacement new...

Страница 8: ...da A 52030 Mirada B 51994 4 FIRING HEAD 95 41115 103 M70 OPERATING INSTRUCTIONS See Chapter 8 Assembly and Packing Inflation Valve Disassembly Rebuilding Process for instructions on servicing the 4111...

Страница 9: ...When the nut 2 is in position inside the tube the washer 3 is placed over the hole with the o ring 4 in the center Cutting hole in the fabric 22 mm IMPORTANT The grip rings of the washer 3 must be pla...

Страница 10: ...ghtened after installation If a leakage appears between the fabric and the relief valve the valve must be taken apart and reinstalled until tight IMPORTANT If using the closing cap be careful the cap...

Страница 11: ...h consists of this transmittal sheet plus four pages Title Revere Aero Compact Liferafts Gas Inflation System Service Bulletin Number 09 16A has technical approval by Revere Survival Inc Signed ______...

Страница 12: ......

Страница 13: ...11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Disassembly Section 3 Testing Sectio...

Страница 14: ...Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8...

Страница 15: ...b 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Feb 25 11 Fe...

Страница 16: ...Feb 25 11 EP 4 9105 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 17: ...LIST OF ASSOCIATED PUBLICATIONS Feb 25 11 9105 AP 1 AP None Listed...

Страница 18: ...Feb 25 11 AP 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 19: ...cury Inside Diameter Kilogram Kilogram per Square Centimeter Ounce s Outside Diameter Package Pound s Pound Force Inch Pound Force Foot Meter s Millibar Millimeter Millimeters of Mercury Minutes Maxim...

Страница 20: ...Feb 25 11 AB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 21: ...ntroduction Description Data and Operation Disassembly Testing and Fault Isolation Cleaning Service Inspection and Check Repair Assembly and Packing Storage Tools Equipment and Materials Illustrated P...

Страница 22: ...Feb 25 11 TC 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 23: ...TION Feb 25 11 9105 1 1 1 General 3 Manual Breakdown 3 A Shop Verification 3 B Warnings Cautions and Notes 3 C Layout of Manual 3 D List of Effective Pages 4 E Record of Revision 4 F Associated Public...

Страница 24: ...Feb 25 11 1 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 25: ...nsibility for the performance of its product when procedures defined in this manual are not adhered to or unapproved personnel perform these procedures All warnings cautions notes in each section are...

Страница 26: ...ed contents lists are issued when necessary The transmittal letter lists in general terms the contents of the revision in the manual All pages that are required to be removed without replacements are...

Страница 27: ...DESCRIPTION DATA AND OPERATION Feb 25 11 9105 2 1 2 General 3 Description 5 A Overview 5 B Detail 6 1 Standard Equipment 6 2 Inflation System 7 Data 10 Operation 13...

Страница 28: ...Feb 25 11 2 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 29: ...Aero Compact liferaft s self inflation system is initiated manually and is stored in a valise for rapid easy access by passengers and crew in the event of an emergency Note Revere Aero Compact liferaf...

Страница 30: ...FIGURE 1 AERO COMPACT 4 person capacity shown Description comparable to 2 person capacity Feb 25 11 2 4 9105...

Страница 31: ...abric These ballast pockets help stabilize the raft in rough weather Aero Compact Life Rafts come fully equipped with life lines a sea anchor a pocket knife a bailer a locator light and a handpump An...

Страница 32: ...ndle is located on the bottom of the Aero Compact 4 person rafts and is used for turning over righting a capsized raft 4 Life Lines Available on the exterior of the raft these lines provide survivors...

Страница 33: ...g They are also equipped with a manual topping off valve IPL Fig 1 Item 30 which can be used to provide additional inflation with the hand pump IPL Fig 1 Item 170 provided or as inflation points for t...

Страница 34: ...FIGURE 2 VALISE Feb 25 11 2 8 9105...

Страница 35: ...FIGURE 3 GAS INFLATION SYSTEM Feb 25 11 9105 2 9...

Страница 36: ...e Inspection Aero 2 2 years after purchase Annually after initial inspection Aero 4 2 years after purchase Annually after initial inspection Cylinder Valve Inflation Test for AC4 only Every 5 years af...

Страница 37: ...0 35 56 x 27 94 x 12 70 71 03 x 71 03 x 10 5 45 79 180 42 x 180 42 x 26 67 116 31 18 0 Aero Compact 4 w canopy and standard equipment pack AC4V K 14 0 x 11 0 x 8 0 35 56 x 27 94 x 20 32 71 03 x 71 03...

Страница 38: ...FIGURE 4 RAFT DIMENSIONS Feb 25 11 2 12 9105...

Страница 39: ...nflation lanyard When inflation is complete the liferaft is ready for boarding Full inflation is achieved in 30 to 60 seconds In the rare event that the liferaft should inflate upside down it can be r...

Страница 40: ...FIGURE 5 DEPLOYMENT Feb 25 11 2 14 9105...

Страница 41: ...FIGURE 6 CANOPY ATTACHMENT Feb 25 11 9105 2 15...

Страница 42: ...Feb 25 11 2 16 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 43: ...DISASSEMBLY Feb 25 11 9105 3 1 3 General 3 Procedures 5...

Страница 44: ...Feb 25 11 3 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 45: ...fit the liferaft The work surface should be smooth preferably constructed of linoleum or PVC covering Caution Extreme care must be exercised when handling a liferaft to protect it from punctures or t...

Страница 46: ...Feb 25 11 3 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 47: ...the gas relief pull cables 3 Loosen the inflation lanyard from around the neck of the cylinder and pass the painterline sachet back through the cylinder neck loop to disconnect See Fig 3 4 Unfold the...

Страница 48: ...FIGURE 1 DISCONNECTING INFLATION HANDLE Shown below with Aero Compact 4 Feb 25 11 3 6 9105 FIGURE 2 DISCONNECTING THE CABLE LOOP...

Страница 49: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Feb 25 11 9105 3 7...

Страница 50: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Feb 25 11 3 8 9105...

Страница 51: ...age Test Procedures 9 A General 9 B Inflatable Chambers 9 a Arch Tube 14 Function Tests 15 A General 15 B Light 15 C Topping Off Valves 15 D Pressure Relief Valves 15 E Inlet Check Valves 16 F Gas Cyl...

Страница 52: ...Feb 25 11 4 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 53: ...o be kept in good condition and safe from damage It will be necessary to remove the packed liferaft from the vessel in order to perform testing procedures Refer to Chapter 3 Disassembly of this manual...

Страница 54: ...Feb 25 11 4 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 55: ..._________ Date __________ Time __________ Tf __________ Pfamb __________ Calculate Pcorrected Corrected Tube Pressure Pressure Main compartment Ptube Pitube Pftube Pass Fail Calculate the corrected tu...

Страница 56: ...Feb 25 11 4 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 57: ...re provided in the previous section Make blank copies and store at the end of the Section 2 Protect liferafts from draughts and direct sunlight as temperature affects pressure 3 Keep at hand a solutio...

Страница 58: ...Feb 25 11 4 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 59: ...the chamber Record the initial tube pressure Pitube temperature Ti time and barometric pressure Piamb Leave sitting for at least four 4 hours but no more than 24 hours 6 Check the buoyancy chamber aft...

Страница 60: ...rips or tears If a rip is located please refer to Chapter 7 Repair 11 Once the repairs are completed retest failed chamber 12 If the chamber passes its air retention test or if repairs have been made...

Страница 61: ...OYANCY TUBES HIGH PRESSURE Change in Barometric Pressure Pamb inHg Raft Tube Pressure Correction psi 30 25 20 15 10 05 04 03 02 01 0 01 02 03 04 05 10 15 20 25 30 1470 1225 0980 0735 0490 0245 0196 01...

Страница 62: ...ES HIGH PRESSURE Change in Temperature F Raft Tube Pressure Correction psi 31 28 25 22 19 16 12 09 06 03 0 03 06 09 12 16 19 22 25 28 31 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 TABLE B BAROMETER A...

Страница 63: ...FIGURE 1 DIGITAL MANOMETER Feb 25 11 9105 4 13...

Страница 64: ...owing into the valve and or tapping on the valve with a finger will usually clear the dust and stop the leak Keep the dust cap in place at all times Allow the arch tube to sit overnight for 16 hours a...

Страница 65: ...finger to depress the valve check This will allow escaping air to dislodge any foreign matter which may be causing faulty seating Remove the probe and recheck for leaks If leaks cannot be rectified re...

Страница 66: ...m the cylinder to obtain an accurate current weight Check current weight of the cylinder against the total weight marked on the cylinder label Renew or recharge the cylinder if the current weight is l...

Страница 67: ...n valve outlets are pointing away from all personnel in the test area 5 Discharge the cylinder by pulling on the inflation valve pull cable loop The valve should open and release gas from cylinder 6 N...

Страница 68: ...t fully charged cylinder B Fit or tighten hose connectors C Connect loop to inflation lanyard correctly Pressure Leaks A Torn or porous fabric B Topping Off valve not fitted or left loose C Foreign ma...

Страница 69: ...CLEANING Feb 25 11 9105 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...

Страница 70: ...Feb 25 11 5 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 71: ...ld be performed The working area must be free from chemicals corrosives and solvents CLEANING MATERIALS Caution Use only cleaning agents used in Table A TABLE A ITEM No DESCRIPTION APPLICATION 1 Mild...

Страница 72: ...Feb 25 11 5 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 73: ...using solvents Liferafts 1 Wash the liferaft with a solution of mild liquid soap Item 1 and water After washing finish with a clean cloth Item 2 2 Wipe clean the inflation equipment with a clean cloth...

Страница 74: ...Feb 25 11 5 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 75: ...SERVICE INSPECTION AND CHECK Feb 25 11 9105 6 1 6 General 3 Gas Inflation System s 5 Valise Pack 7...

Страница 76: ...Feb 25 11 6 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 77: ...tion date on the light and inspect for damage Replace if necessary Check floating knife for any cracks in plastic Replace if necessary Fabric Inspect all fabric components for Slits tears and holes Pi...

Страница 78: ...Feb 25 11 6 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 79: ...at the syphon tube IPL Fig 3 Item 30 inside the cylinder is still serviceable Shake the cylinder if the tube is still flexible it will strike the wall of the cylinder with a ringing sound If there is...

Страница 80: ...Feb 25 11 6 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 81: ...VALISE PACKS Feb 25 11 9105 6 7 Inspect valise for Cleanliness freedom from splits tears or other obvious signs of damage Legibility of all marks and labels...

Страница 82: ...Feb 25 11 6 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 83: ...A Adhesive 5 B Preparation of Coasted Surfaces 6 C Applying Adhesive 7 D Repairing Torn Areas 8 1 Patches 8 2 Applying Patches 8 3 Repair Limits for External Patches 9 E Component Repair 10 1 Pressur...

Страница 84: ...Feb 25 11 7 2 9105 THIS PAGE IS INTENTIONALLY LEFT BLANK...

Страница 85: ...hes C Rafts with any tear rip to abrasion damage exceeding 6in 15cm in length D Rafts older than 9 years from the date of manufacture that require major repairs or repairs other than the minor repairs...

Страница 86: ...Feb 25 11 7 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 87: ...repairs is supplied in a 4oz can with brush top Part No 306 004 B Only the specified adhesive shall be used for the repair of liferafts manufactured by Revere Supply Co Inc Using unspecified adhesive...

Страница 88: ...nt is applied with a lint free fabric pad wet but not dripping with the solvent Adequate preparation is shown by the development of a matte appearance and a limited degree of tackiness C After being w...

Страница 89: ...dried it may be enlivened with a cloth dampened with MEK solvent Apply just enough solvent to recreate an aggressive tack on the surface Reactivation may be carried out up to three 3 hours after the...

Страница 90: ...is 1in 25mm the patch must be at least 3in 75mm in diameter If a straight tear is 1in 25mm long the patch must be at least 3in 75mm x 2in 50mm L shaped tears are to be treated as holes reckoning the d...

Страница 91: ...urs to the seam between the floor and the buoyancy tube a patch may be fitted providing that is complies with the limits specified below In this instance the floor seam must be opened the floor repair...

Страница 92: ...lief valve is not permitted Unscrew the valve and replace Topping Off Valve Unscrew the valve and replace Inlet Check Valves Unscrew the valves and replace Inflation Valve See Chapter 8 Assembly for i...

Страница 93: ...FIGURE 1 PATCHES AND TAPE APPLICATION Feb 25 11 9105 7 11...

Страница 94: ...FIGURE 2 PATCH APPLICATION OVER SEAM Feb 25 11 7 12 9105...

Страница 95: ...pairs Make blank copies of this form and fill out charts when needed TABLE A REPAIR RECORD LIFERAFT TYPE No SERIAL No REPAIRS REQUIRED PART DAMAGE FORM OF REPAIR INSP BY Buoyancy Tube Floor Inflation...

Страница 96: ...Feb 25 11 7 14 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 97: ...5 8 1 8 General 3 Component Setup s 5 A Handpump and Bailer 5 B Sea Anchor 5 C Painterline 5 D Light 5 E Knife 5 F Inflation Valve Cylinder 6 G Canopy 6 Inflation Valve Disassembly Rebuilding Process...

Страница 98: ...Feb 25 11 8 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 99: ...ated otherwise The ends of nylon cords are to be heat sealed to prevent fraying and secured with white adhesive tape When gathering cordage it is important to fake fold accordion style the line instea...

Страница 100: ...Feb 25 11 8 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 101: ...hor Fake Fold sea anchor line into 10in folds and secure each with a small rubber band Fold sea anchor and wrap remaining line around it twice to secure See Fig 2C Secure sea anchor to the raft with a...

Страница 102: ...to the oral tube Hold in place to keep the valve open At the same time squeeze the arch tube to force all the air out through the oral valve until it is completely evacuated and flat A vacuum hose can...

Страница 103: ...Feb 25 11 9105 8 7 FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION...

Страница 104: ...FIGURE 2E PREPARING LIGHT Feb 25 11 8 8 9105 FIGURE 2F INFLATION VALVE CYLINDER PREPARATION...

Страница 105: ...inder 1 3 41115 Disassembly Rebuilding 1 4 41115 Reassembly Rebuilding 1 5 41115 Inflation Valve Installation 1 6 Charging Cylinder 1 7 CO2 Leak Test Refer to Chapter 11 Illustrated Parts List Figure...

Страница 106: ...20 34 Nm Fill Fitting Plug Snug Hand Tight 1 2 Removal of Inflation Valve from Cylinder 1 2 1 Important Make Sure Cylinder has been emptied prior to removing Inflation Valve Refer to Chapter 4 Testin...

Страница 107: ...require a standard or open ended wrench If using a socket A 6pt socket is recommended to minimize dings to the hex edges rotate the fitting to be removed to this cut out Step 1 Remove the straight out...

Страница 108: ...70 from Fill Fitting Housing Step 5 Using a socket wrench remove the Safety Disk Retainer IPL Fig 4 Item 110 Disk and Washer IPL Fig 4 Item 80 Step 6 Remove the Piston Housing IPL Fig 4 Item 140 Step...

Страница 109: ...ting Cap Safety Disk Retainer Piston Step 9 Inspect all components for damage and corrosion replace as necessary Clean all components of old grease and dirt use cotton swabs to clean ports Use shop ai...

Страница 110: ...embly Process 1 4 3 All O rings Safety Rupture Disk Piston and Spring are replaced every six years Scheduled during the cylinder valve inflation test and cylinder hydrostatic test 1 4 4 Lubricate all...

Страница 111: ...as necessary Step 2 Being sure the Safety Pin hole is facing upwards install the Piston Housing IPL Fig 4 Item 140 and Pull Lanyard IPL Fig 4 170 The Lanyard should be secure in the housing if instal...

Страница 112: ...d torque to the settings in Table A Step 7 Install Sealing Washer IPL Fig 4 Item 70 into Fill Fitting Cavity Step 8 Install Fill Fitting Poppet IPL Fig 4 Item 40 After Fill Fitting Poppet has been ins...

Страница 113: ...25 11 9105 8 17 Step 9 Install Fill Fitting Cap IPL Fig 4 Item 160 and hand tighten Step 10 Apply thread sealant Loctite to Outlet Fitting before installing Torque according to settings listed in Tabl...

Страница 114: ...should be encountered until O ring enters the O ring groove on the top 1 5 4 Torque inflation valve into Cylinder using a NIST calibrated torque wrench Refer to torque Table A Torque Settings for corr...

Страница 115: ...ll Diffuser Caps on outlet connectors 1 6 3 Remove Fill Fitting Cap 1 6 4 Above figures show a picture of the Charge Adaptor proper installation of the charging hose using the Charge Adaptor and Quick...

Страница 116: ...y bag over the neck of the cylinder Leave sitting for 1 hour 1 7 2 The purple Leak Test Solution is a combination of chemicals and water Based on the amount of CO2 leakage the solution will turn light...

Страница 117: ...ig 4 See end of this Section for Charging of Cylinders 4 Properly stow all components in the liferaft before folding For canopy versions only install 2 canopy buckle straps and 4 metal key rings to th...

Страница 118: ...e sachet to valise using a 8 length of black nylon 1 16in cord IPL Fig 1 Item 140 Run the cord through the two holes in both the valise and the sachet and secure with three 3 bowline knots Trim off an...

Страница 119: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE Feb 25 11 9105 8 23 FIGURE 4 ATTACHING THE CYLINDER...

Страница 120: ...FIGURE 5 STORAGE OF COMPONENTS Feb 25 11 8 24 9105...

Страница 121: ...FIGURE 6A AC2V FOLDING DIAGRAM STEP 1 Feb 25 11 9105 8 25 Note Refer to Chapter 2 Description Table A for the L x W x H dimensions shown in the following folding diagrams...

Страница 122: ...FIGURE 6B AC2V FOLDING DIAGRAM STEP 2 Feb 25 11 8 26 9105...

Страница 123: ...FIGURE 6C AC2V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 27...

Страница 124: ...FIGURE 6D AC2V FOLDING DIAGRAM STEP 4 Feb 25 11 8 28 9105 FIGURE 6E AC2V FOLDING DIAGRAM STEP 5...

Страница 125: ...FIGURE 6F AC2V FOLDING DIAGRAM STEP 6 Feb 25 11 9105 8 29 FIGURE 6G AC2V FOLDING DIAGRAM STEP 7...

Страница 126: ...FIGURE 6H AC2V FOLDING DIAGRAM CC4 STEP 8 Feb 25 11 8 30 9105...

Страница 127: ...FIGURE 7A AC4V FOLDING DIAGRAM STEP 1 Feb 25 11 9105 8 31...

Страница 128: ...FIGURE 7B AC4V FOLDING DIAGRAM STEP 2 Feb 25 11 8 32 9105...

Страница 129: ...FIGURE 7C AC4V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 33...

Страница 130: ...FIGURE 7D AC4V FOLDING DIAGRAM STEP 4 Feb 25 11 8 34 9105...

Страница 131: ...FIGURE 7E AC4V FOLDING DIAGRAM STEP 5 Feb 25 11 9105 8 35...

Страница 132: ...FIGURE 7F AC4V FOLDING DIAGRAM STEP 6 Feb 25 11 8 36 9105...

Страница 133: ...FIGURE 7G AC4V FOLDING DIAGRAM STEP 7 Feb 25 11 9105 8 37...

Страница 134: ...FIGURE 7H AC4V FOLDING DIAGRAM STEP 8 Feb 25 11 8 38 9105 FIGURE 7I AC4V FOLDING DIAGRAM STEP 9...

Страница 135: ...FIGURE 7J CC6 FOLDING DIAGRAM STEP 10 Feb 25 11 9105 8 39 FIGURE 7K AC4V FOLDING DIAGRAM STEP 11...

Страница 136: ...FIGURE 7L CC6 FOLDING DIAGRAM STEP 12 Feb 25 11 8 40 9105...

Страница 137: ...FIGURE 8 PAINTERLINE LOOPS Feb 25 11 9105 8 41 FIGURE 9 ATTACHMENT OF CYLINDER NECK LOOP...

Страница 138: ...FIGURE 10 ATTACHMENT OF CABLE LOOP Feb 25 11 8 42 9105...

Страница 139: ...FIGURE 11 ATTACHMENT OF PAINTERLINE SACHET Feb 25 11 9105 8 43 DETAIL A ATTACHMENT OF PAINTERLINE LOOP...

Страница 140: ...Feb 25 11 8 44 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 141: ...REV 6 3 3 5 Paddles 301 019 7 2 Canopy Arch Ass y 41159 101 8 1 1 1 Compass 50 331 9 1 Emergency Blanket 95 301 038CRD 10 1 Raft Repair Kit 41142 101 11 1 1 1 Sea Dye Marker 10 REV065 12 1 1 1 Signal...

Страница 142: ...1 folded canopy Item 41154 101 and 1 folded canopy arch Item 41159 101 prior to packaging other items 2 Fold ends of canopy neatly inside valise after remaining items have been properly packing valis...

Страница 143: ...Feb 25 11 9105 8 47 Standard Kit Pack...

Страница 144: ...Feb 25 11 8 48 9105 Standard Plus Kit Pack...

Страница 145: ...Feb 25 11 9105 8 49 Deluxe Kit Pack...

Страница 146: ...Feb 25 11 8 50 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 147: ...STORAGE Feb 25 11 9105 9 1 9 General 3 s...

Страница 148: ...Feb 25 11 9 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 149: ...l around for easy removal All rafts should be stowed in a clean dry contaminant free area away from any heat source Contaminants such as petroleum solvents fuel grease from oil and hydraulic fluids ma...

Страница 150: ...Feb 25 11 9 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 151: ...TOOL EQUIPMENT AND MATERIALS Feb 25 11 9105 10 1 10 General 3 Breakdown 5...

Страница 152: ...Feb 25 11 10 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 153: ...ials used to service the Aero Compact Liferafts To keep your tools in proper working order take care of them by Inspecting and adjusting daily Replacing worn or broken parts Cleaning and lubricating w...

Страница 154: ...Feb 25 11 10 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 155: ...oil free air supply of 5 6 to 7 0 kg cm2 80 to 100 psig regulated to 140 g cm2 2 0 psig for inflation purposes G Solution of mild liquid soap and water NOT detergent H Lint free cloth clean and dry I...

Страница 156: ...t J Valve Charging Body Quick Connect K Bleed Down Tool L Socket 1 3 8in M Graphite Moly Lubricant Diversified Brands N Silicone Lubricant Nye Lubricants O Shop Towels Cotton Swabs P Alcohol Solvent Q...

Страница 157: ...IMAGES Feb 25 11 9105 10 7 Bleed Down Tool Part 338 007 Inflation Tool w Ball Valve Quick Connect End Part 41128 101 Deflation Tool Part 41129 101 Socket 1 3 8in Part 338 008...

Страница 158: ...Feb 25 11 10 8 9105 Quick Disconnect Valve Charging Stem Part 338 005 Quick Disconnect Valve Charging Body Part 338 006...

Страница 159: ...ILLUSTRATED PARTS LIST IPL Feb 25 11 9105 11 1 11 Introduction 3 Numerical Parts List 7 Detailed Parts List 11 Image List 23...

Страница 160: ...Feb 25 11 11 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 161: ...part number but different quantities per assembly will be assigned a suffix as a variant of the original part number e g 10 and 10A 3 PART NUMBERING Revere Supply Co Inc part number 4 ILLUSTRATIONS A...

Страница 162: ...primary codes which other items will reference If an item is applicable to all units the EFF CODE column is left blank Example Item 10 is used in Assembly 1B as indicated by the listing of effectivity...

Страница 163: ...quired per assembly or per sub assembly as required 9 IMAGE NUMBER Certain illustrated parts are assigned image numbers which correspond to component photos in the Image List at the end of this sectio...

Страница 164: ...Feb 25 11 11 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 165: ...an alpha numeric list of all part numbers included in the Detailed Parts List Each part number is followed by the applicable FIG ITEM number When a part number is referenced in more than one Figure b...

Страница 166: ...5 002 1 40 1 326 006 3 30 1 326 033 1 30 1 327 061 3 20 1 41009 101 2 10 1 41013 103 2 20 1 41017 101 2 30 1 41027 101 1 110 1 41029 101 2 40 1 41047 1 3 40 1 41065 101 1 120 1 41083 101 2 50 1 41083...

Страница 167: ...1 41115 13 4 130 1 41115 14 4 140 1 41115 15 4 150 1 41115 16 4 160 1 41115 17 4 170 1 41115 18 4 180 1 41115 19 4 190 1 41115 20 4 200 1 41115 101 3 10 4 1 1 RF 41154 101 1 220 1 41159 101 1 250 1 41...

Страница 168: ...Feb 25 11 11 10 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 169: ...equivalent substitutes are to be used for listed items without the prior written consent of Revere Supply Co Inc Revere Supply Co Inc will not accept responsibility for any equipment malfunction wher...

Страница 170: ...FIGURE 1 LIFE RAFT ASSEMBLY Feb 25 11 11 12 9105...

Страница 171: ...CDEF 1 20 41114 105 Cylinder Valve Assy Aero Compact 2 See Fig 3 A 1 20A 41114 107 Cylinder Valve Assy Aero Compact 4 See Fig 3 BCDEF 1 30 326 033 Topping Off Valve 1 1 40 325 002 Fixed Inlet Check 5...

Страница 172: ...1 10 190 41186 1 Owner s Manual 1 200 301 028 Key Ring BCDEF 4 11 210 41169 101 Canopy Buckle Strap BCDEF 2 12 220 41154 101 Canopy Assembly CC4 C 1 230 41159 101 Canopy Arch Assembly CC4 C 1 240 412...

Страница 173: ...Feb 25 11 9105 11 15 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 174: ...FIGURE 2 HULL ASSEMBLY Feb 25 11 11 16 9105...

Страница 175: ...1 Hull Assy Aero Compact 2 A RF 1A 41094 101 Hull Assy Aero Compact 4 B RF 10 41009 101 Knife Pocket 1 20 41013 103 Lifeline Graspline Loop Patch 8 30 41017 101 Light Holder 1 40 41029 101 Battery Hol...

Страница 176: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Feb 25 11 11 18 9105...

Страница 177: ...ssy CO2 Aero Compact 2 A RF 1A 41114 107 Cylinder Valve Assy CO2 Aero Compact 4 B RF 10 41115 101 Inflation Valve Model 41115 See Figure 4 for breakdown 1 14 20 327 061 Cylinder DOT3AL1800 61cu in AB...

Страница 178: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Feb 25 11 11 20 9105...

Страница 179: ...ing 1 70 41115 7 Washer Sealing 1 80 41115 8 Washer Seal 1 90 41115 9 O Ring 2 010 1 100 41115 10 Safety Disk 1800 PSI Service 1 110 41115 11 Safety Disk Retainer 1 120 41115 12 Piston Spring 1 130 41...

Страница 180: ...Feb 25 11 11 22 9105 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 181: ...f Valve Part 326 033 FIG ITEM QTY 1 30 1 ITEM 2 Fixed Inlet Check 5 Female Part 325 002 FIG ITEM QTY 1 40 1 ITEM 3 Pressure Release Valve Medium Flow Part 324 003 FIG ITEM QTY 1 50 1 ITEM 4 Painterlin...

Страница 182: ...5 PFD Light Part 319 001 FIG ITEM QTY 1 90 1 ITEM 6 Knife Low Profile Part 41193 101 FIG ITEM QTY 1 100 1 ITEM 7 Sea Anchor Part 41027 101 FIG ITEM QTY 1 110 1 ITEM 8 Bailing Bucket Assembly Part 4106...

Страница 183: ...Assembly with Adapter Part 301 001 FIG ITEM QTY 1 170 1 ITEM 10 Valve Cover AC2 AC4 Part 41206 101 FIG ITEM QTY 1 180 1 ITEM 11 Key Ring Part 301 028 FIG ITEM QTY 1 200 4 ITEM 12 Canopy Buckle Strap...

Страница 184: ...7 101 FIG ITEM QTY 1 240 1 ITEM 14 Inflation Valve Model 41115 Part 41115 101 FIG ITEM QTY 3 10A 4 1 1 RF ITEM 15 Cord Nylon 1 16 Black Part 313 004 Sold per yard min 10yrds For use with internal stra...

Страница 185: ...tificate A 3 page version of the certificate is provided to every service station Completion of this form is required at every service Copies of the form will then be sent to the appropriate group as...

Страница 186: ...Feb 25 11 9105 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 187: ...al Upper Tube On Off Lower Tube On Off Floor EQUIPMENT ITEMS Item Checked Replaced Item Checked Replaced Instruction hand book Survival manual Bailer Hand Foot pump Flashlight spare bulbs Paddles Sea...

Страница 188: ......

Отзывы:

Похожие инструкции для 45-AC2V