TEST RECORD CHART
Feb 25/11
9105
4 - 5
Keep records of ALL inflation tests. Make blank copies of this form and fill out charts when needed.
LEAKAGE TEST RECORD
– AERO COMPACT
LIFERAFT TYPE No.
SERIAL No.
INSPECTED BY:
CHECKED BY:
PACK LIFERAFTS WITHIN 48 HOURS OF TEST, UNLESS STORED UNDER APPROVED CONDITIONS
RE-TEST if not operationally packed within 30 days of test
Date __________
Time __________
Ti
__________
Pi
amb
__________
Date __________
Time __________
Tf
__________
Pf
amb
__________
Calculate
P
corrected
(Corrected Tube
Pressure)
Pressure: Main compartment
(P
tube
)
(Pi
tube
)
(Pf
tube
)
Pass/Fail
Calculate the corrected tube pressure value (P
corrected
) as follows (or use Table C):
For English measure; (psig, °F, in. Hg)
P
corrected
= P
tube
+ {0.031 x (Ti – Tf)} + {0.49 x (Pf
amb
–
Pi
amb
)}
For metric measure; (bar, °C, cm. Hg)
P
corrected
= P
tube
+ {0.00378 x (Ti – Tf)} + {0.0131 x (Pf
amb
–
Pi
amb
)}
Legend:
Pi
amb
= Initial Barometric
Pressure
Pf
amb
= Final Barometric
Pressure
Ti = Initial Temperature
Tf = Final Temperature
P
tube
= Initial Tube
Pressure
P
corrected
= Corrected Tube
Pressure
TABLE A
Содержание 45-AC2V
Страница 1: ......
Страница 2: ......
Страница 4: ...Feb 25 11 RR 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 6: ...Feb 25 11 SB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ......
Страница 16: ...Feb 25 11 EP 4 9105 PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 17: ...LIST OF ASSOCIATED PUBLICATIONS Feb 25 11 9105 AP 1 AP None Listed...
Страница 18: ...Feb 25 11 AP 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 20: ...Feb 25 11 AB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 22: ...Feb 25 11 TC 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...Feb 25 11 1 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ...Feb 25 11 2 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 30: ...FIGURE 1 AERO COMPACT 4 person capacity shown Description comparable to 2 person capacity Feb 25 11 2 4 9105...
Страница 34: ...FIGURE 2 VALISE Feb 25 11 2 8 9105...
Страница 35: ...FIGURE 3 GAS INFLATION SYSTEM Feb 25 11 9105 2 9...
Страница 38: ...FIGURE 4 RAFT DIMENSIONS Feb 25 11 2 12 9105...
Страница 40: ...FIGURE 5 DEPLOYMENT Feb 25 11 2 14 9105...
Страница 41: ...FIGURE 6 CANOPY ATTACHMENT Feb 25 11 9105 2 15...
Страница 42: ...Feb 25 11 2 16 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 43: ...DISASSEMBLY Feb 25 11 9105 3 1 3 General 3 Procedures 5...
Страница 44: ...Feb 25 11 3 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 46: ...Feb 25 11 3 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 49: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Feb 25 11 9105 3 7...
Страница 50: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Feb 25 11 3 8 9105...
Страница 52: ...Feb 25 11 4 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 54: ...Feb 25 11 4 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 56: ...Feb 25 11 4 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 58: ...Feb 25 11 4 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 63: ...FIGURE 1 DIGITAL MANOMETER Feb 25 11 9105 4 13...
Страница 69: ...CLEANING Feb 25 11 9105 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 70: ...Feb 25 11 5 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 72: ...Feb 25 11 5 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 74: ...Feb 25 11 5 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 75: ...SERVICE INSPECTION AND CHECK Feb 25 11 9105 6 1 6 General 3 Gas Inflation System s 5 Valise Pack 7...
Страница 76: ...Feb 25 11 6 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 78: ...Feb 25 11 6 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 80: ...Feb 25 11 6 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 82: ...Feb 25 11 6 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 84: ...Feb 25 11 7 2 9105 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 86: ...Feb 25 11 7 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 93: ...FIGURE 1 PATCHES AND TAPE APPLICATION Feb 25 11 9105 7 11...
Страница 94: ...FIGURE 2 PATCH APPLICATION OVER SEAM Feb 25 11 7 12 9105...
Страница 96: ...Feb 25 11 7 14 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...Feb 25 11 8 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 100: ...Feb 25 11 8 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 103: ...Feb 25 11 9105 8 7 FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION...
Страница 104: ...FIGURE 2E PREPARING LIGHT Feb 25 11 8 8 9105 FIGURE 2F INFLATION VALVE CYLINDER PREPARATION...
Страница 119: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE Feb 25 11 9105 8 23 FIGURE 4 ATTACHING THE CYLINDER...
Страница 120: ...FIGURE 5 STORAGE OF COMPONENTS Feb 25 11 8 24 9105...
Страница 122: ...FIGURE 6B AC2V FOLDING DIAGRAM STEP 2 Feb 25 11 8 26 9105...
Страница 123: ...FIGURE 6C AC2V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 27...
Страница 124: ...FIGURE 6D AC2V FOLDING DIAGRAM STEP 4 Feb 25 11 8 28 9105 FIGURE 6E AC2V FOLDING DIAGRAM STEP 5...
Страница 125: ...FIGURE 6F AC2V FOLDING DIAGRAM STEP 6 Feb 25 11 9105 8 29 FIGURE 6G AC2V FOLDING DIAGRAM STEP 7...
Страница 126: ...FIGURE 6H AC2V FOLDING DIAGRAM CC4 STEP 8 Feb 25 11 8 30 9105...
Страница 127: ...FIGURE 7A AC4V FOLDING DIAGRAM STEP 1 Feb 25 11 9105 8 31...
Страница 128: ...FIGURE 7B AC4V FOLDING DIAGRAM STEP 2 Feb 25 11 8 32 9105...
Страница 129: ...FIGURE 7C AC4V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 33...
Страница 130: ...FIGURE 7D AC4V FOLDING DIAGRAM STEP 4 Feb 25 11 8 34 9105...
Страница 131: ...FIGURE 7E AC4V FOLDING DIAGRAM STEP 5 Feb 25 11 9105 8 35...
Страница 132: ...FIGURE 7F AC4V FOLDING DIAGRAM STEP 6 Feb 25 11 8 36 9105...
Страница 133: ...FIGURE 7G AC4V FOLDING DIAGRAM STEP 7 Feb 25 11 9105 8 37...
Страница 134: ...FIGURE 7H AC4V FOLDING DIAGRAM STEP 8 Feb 25 11 8 38 9105 FIGURE 7I AC4V FOLDING DIAGRAM STEP 9...
Страница 135: ...FIGURE 7J CC6 FOLDING DIAGRAM STEP 10 Feb 25 11 9105 8 39 FIGURE 7K AC4V FOLDING DIAGRAM STEP 11...
Страница 136: ...FIGURE 7L CC6 FOLDING DIAGRAM STEP 12 Feb 25 11 8 40 9105...
Страница 137: ...FIGURE 8 PAINTERLINE LOOPS Feb 25 11 9105 8 41 FIGURE 9 ATTACHMENT OF CYLINDER NECK LOOP...
Страница 138: ...FIGURE 10 ATTACHMENT OF CABLE LOOP Feb 25 11 8 42 9105...
Страница 139: ...FIGURE 11 ATTACHMENT OF PAINTERLINE SACHET Feb 25 11 9105 8 43 DETAIL A ATTACHMENT OF PAINTERLINE LOOP...
Страница 140: ...Feb 25 11 8 44 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 143: ...Feb 25 11 9105 8 47 Standard Kit Pack...
Страница 144: ...Feb 25 11 8 48 9105 Standard Plus Kit Pack...
Страница 145: ...Feb 25 11 9105 8 49 Deluxe Kit Pack...
Страница 146: ...Feb 25 11 8 50 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 147: ...STORAGE Feb 25 11 9105 9 1 9 General 3 s...
Страница 148: ...Feb 25 11 9 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 150: ...Feb 25 11 9 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 151: ...TOOL EQUIPMENT AND MATERIALS Feb 25 11 9105 10 1 10 General 3 Breakdown 5...
Страница 152: ...Feb 25 11 10 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 154: ...Feb 25 11 10 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 158: ...Feb 25 11 10 8 9105 Quick Disconnect Valve Charging Stem Part 338 005 Quick Disconnect Valve Charging Body Part 338 006...
Страница 160: ...Feb 25 11 11 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 164: ...Feb 25 11 11 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 168: ...Feb 25 11 11 10 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FIGURE 1 LIFE RAFT ASSEMBLY Feb 25 11 11 12 9105...
Страница 173: ...Feb 25 11 9105 11 15 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...FIGURE 2 HULL ASSEMBLY Feb 25 11 11 16 9105...
Страница 176: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Feb 25 11 11 18 9105...
Страница 178: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Feb 25 11 11 20 9105...
Страница 180: ...Feb 25 11 11 22 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 186: ...Feb 25 11 9105 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 188: ......