
FIRST Global Building Guide Created by REV Robotics 2019, Licensed Under CC BY-SA
4
Most of the connectors on the Control Hub and Expansion Hub are keyed, meaning that the connector is shaped so that it
is not possible to plug the cable in backwards. The Servo Motor ports and the 5V Power ports are not keyed and the pin
out is shown in Figure 3Figure 3
Figure 3: Servo and 5V Power Port Pinouts
2.2
SYSTEM WIRING DIAGRAM
Figure 4: System Wiring Diagram
Содержание FIRST Global
Страница 26: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 24 Figure 40 M3 Drop in Bolt...
Страница 45: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 43 GEARS 1 1 Scale...
Страница 46: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 44 SPROCKETS 1 1 Scale...
Страница 47: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 45 WHEELS 1 1 Scale...
Страница 49: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 47 BRACKETS 1 1 Scale...
Страница 50: ...FIRST Global Building Guide Created by REV Robotics 2019 Licensed Under CC BY SA 48...