Cleaning, wear and service
30
Pos : 12.14 / 0020 Ü berschrif ten/ 1. 1. 1. Ü berschrif ten/ 111 Brechbac ken aust auschen @ 5\ mod_1345454370810_9. doc x @ 34230 @ 3 @ 1
7.2.1
Replacing the breaking jaws
Pos : 12.15 / 0005 R ET SCH/ 0005 RET SCH Bedi enungsanleit ungen Kapitels ammlungen/ BB50/ 0010 R einigung Wart ung Verschl eiß/ 0009 BB50 Modul Br ec hbac ken vorn aust aus chen @ 5\mod_1346078785877_9. doc x @ 34743 @ 3 @ 1
7.2.2
Replacing the front breaking jaw
NOTICE
Zircon breaking jaws (
ZB
) are bonded across the entire surface (
ZV
).
•
Have the zircon breaking jaws replaced by an authorised service
technician.
Fig. 24: Bonding the zircon breaking jaws
•
Empty the grinding chamber before replacing the breaking jaws.
•
Set the gap width to between 2 and 10 mm.
Fig. 25: Removing the bolt
•
Twist the grip of the bolt (
G
) until the locking pin (
Gp
) can be seen in the top opening of the guide.
G
Gp
ZV
ZB
Содержание BB50
Страница 1: ...Retsch GmbH 42781 Haan Retsch Allee 1 5 Germany 06 07 2016 0003 Manual Jaw Crusher BB50 Translation...
Страница 2: ...2 Copyright Copyright by Retsch GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany...
Страница 3: ...3...
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Copyright Copyright by Retsch GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany...