background image

 

3

 

Содержание BB50

Страница 1: ...Retsch GmbH 42781 Haan Retsch Allee 1 5 Germany 06 07 2016 0003 Manual Jaw Crusher BB50 Translation...

Страница 2: ...2 Copyright Copyright by Retsch GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany...

Страница 3: ...3...

Страница 4: ...ater 15 4 4 Conditions for the place of installation 15 4 5 Electrical connection 16 4 6 Type plate description 16 4 7 Removing Transport Safeguards 17 4 8 Removing the transport safeguard 18 4 9 Inst...

Страница 5: ...er cover 29 7 2 Service 29 7 2 1 Replacing the breaking jaws 30 7 2 2 Replacing the front breaking jaw 30 7 3 Wear 33 7 3 1 Resetting the wear alert 33 7 3 1 1 Setting the operating time until the cal...

Страница 6: ...erating manual does not contain any repair instructions If faults arise or repairs are necessary please contact your supplier or get in touch with Retsch GmbH directly Application technology informati...

Страница 7: ...tion to be taken WARNING Moderate or mild injury may result from failing to heed these safety warnings We give you the following warnings and corresponding content CAUTION Type of danger personal inju...

Страница 8: ...he machine have noted and understood all the regulations regarding safety are familiar before starting work with all the operating instructions and specifications for the target group relevant for the...

Страница 9: ...9 1 This operating manual does not contain any repair instructions For your own safety repairs may only be carried out by Retsch GmbH or an authorized representative or by Retsch service engineers In...

Страница 10: ...at s he has received sufficient instructions about the operation and maintenance of the system The user has received the operating manual has read and taken note of its contents and consequently has a...

Страница 11: ...n the BB 50 include the following Bakelite Bauxite Basalt Concrete building materials Dolomite Ores Feld spar Granite Rubblestone Glass Limestone Ceramic Gravel Boneblack Coke Corundum Alloys Oxide ce...

Страница 12: ...ap width setting is infinitely adjustable The machine has a stationary crusher arm RB connected to the gap width adjustment D and a mobile crusher arm SB Replaceable breaking jaws are attached to both...

Страница 13: ...Technische D aten 0025 BB50 M odul Schutzart 5 mod_1345704766746_9 docx 34402 1 IP20 Pos 5 14 0020 berschriften 1 1 berschriften 1 1 berschriften BDA 11 M otordr ehzahl 1 mod_1241508280705_9 docx 8763...

Страница 14: ...approx 76 kg Fig 3 Dimensions Pos 5 24 0020 berschriften 1 1 berschriften 1 1 berschriften BDA 11 Erfor derliche Standfl che 0 mod_1226492678414_9 docx 3364 2 1 3 11 Required floor space Pos 5 25 000...

Страница 15: ...s 7 7 0020 berschriften 1 1 berschriften 1 1 berschriften BD A 11 Temper aturschwankung en 0 mod_1226495190738_9 docx 3404 2 1 4 3 Temperature fluctuations and condensed water Pos 7 8 0025 Warnhinweis...

Страница 16: ...e device Make sure the levels agree with the existing mains power supply Use the supplied connection cable to connect the device to the mains power supply Pos 7 16 0025 War nhi nweise H 0008 H INWEIS...

Страница 17: ...porthilfe entfernen 0 mod_1229076673566_9 docx 5020 2 1 4 7 Removing Transport Safeguards Pos 7 20 0005 RETSCH 0005 R ETSCH Bedienungsanlei tungen Kapitelsamml ung en BB50 0006 Ver packung Tr ansport...

Страница 18: ...g entfer nen 5 mod_1357546736532_9 docx 37050 1 Fig 7 Removing the transport lock The machine is secured by steel plates on both sides Remove the two screws TS Pull the transport lock TB out sideways...

Страница 19: ...ften 1 1 berschriften 1 1 berschriften BD A 11 Ansichten des Ger tes R etsch 0 mod_1228990581782_9 docx 4966 2 1 5 1 Views of the Instrument Pos 9 3 0005 R ETSCH 0005 RETSCH Bedienungsanl eitung en Ka...

Страница 20: ...Operating the machine 20 Fig 10 Machine partially open Pos 9 4 0005 R ETSCH 0005 RETSCH Bedienungsanl eitung en Kapi telsammlungen Seitenumbruch 0 mod_1222344373758_0 docx 2386 1 P R G S E D F...

Страница 21: ...l and display see below G Bolt for front crusher arm Holds the front crusher arm H On and off switch Disconnects the controller from or connects it to the mains K Machine fuse Overload protection Disc...

Страница 22: ...4978 2 1 5 4 Overview Table of the Operating Elements and the Display Pos 9 11 0005 RETSCH 0005 R ETSCH Bedienungsanlei tungen Kapitelsamml ung en BB50 0007 Bedi enung 0008 BB50 M odul bersichtstabel...

Страница 23: ...tungen Kapitelsamml ung en BB50 0007 Bedi enung 0011 BB50 M odul Spaltweite Nullstell ung 5 mod_1346050929641_9 docx 34540 1 NOTICE The gap width may only be adjusted during idling without grinding ma...

Страница 24: ...ise not correspond to the actual gap width Pos 9 17 0020 berschriften 1 1 berschriften 1 1 berschriften BDA 11 Spaltweite einstell en 5 mod_1345445670122_9 docx 34150 2 1 5 7 Setting the gap width Pos...

Страница 25: ...eep the reverse button pressed and wedged material will be dislodged Pos 9 21 0020 berschriften 1 1 berschriften 1 1 berschriften BDA 11 Dr ehzahl ei nstellen 1 mod_1250081022665_9 docx 13816 2 1 5 9...

Страница 26: ...can increase the gap width sw with a twist of the hand wheel D in an anti clockwise direction The values on the display F1 specify the gap width in mm The display accuracy is 0 1mm The end of the grin...

Страница 27: ...344568006_9 docx 2435 2 1 6 1 Fault messages Pos 11 3 0005 RETSCH 0005 R ETSCH Bedienungsanlei tungen Kapitelsamml ung en BB50 0009 Sicherheitsfunktionen und Fehler anzeige 0008 BB50 M odul Fehler mel...

Страница 28: ...Use only a cloth dampened with water Disconnect the power supply plug before cleaning the blender Pos 12 4 0005 RETSCH 0005 R ETSCH Bedienungsanlei tungen Kapitelsamml ung en BB50 0010 R einigung Wart...

Страница 29: ...crew both screws As Remove the splash back protection for cleaning A Secure the splash back protection to the fill hopper again after cleaning Pos 12 10 0020 berschriften 1 1 1 berschriften 111 M ahlr...

Страница 30: ...n vorn austauschen 5 mod_1346078785877_9 docx 34743 3 1 7 2 2 Replacing the front breaking jaw NOTICE Zircon breaking jaws ZB are bonded across the entire surface ZV Have the zircon breaking jaws repl...

Страница 31: ...removal tool Pull the bolt G out of the guide Place the bolt G in the removal groove Rn of the front crusher arm Fig 27 Removing the breaking jaw Pull the crusher arm upwards out of the machine Fig 28...

Страница 32: ...2 16 0005 R ETSCH 0005 RETSCH Bedi enungsanleitungen Kapitelsammlungen BB50 0010 R einigung Wartung Verschl ei 0010 BB50 Modul Br echbacken hi nten austauschen 5 mod_1346078786485_9 docx 34754 1 Fig 3...

Страница 33: ...ei 5 mod_1346078787141_9 docx 34765 34 1 7 3 1 Resetting the wear alert NOTICE After replacing the breaking jaws the wear warning should be reset Fig 32 Wear alert The wear alert F42 appears when the...

Страница 34: ...0h and h is displayed in the speed F2 display Briefly press the button F4 to increase the operating time in increments of 10 Briefly press the button F4 to decrease the operating time in increments of...

Страница 35: ...mmunity Within the European Community the disposal of electrically operated devices is regulated by national provisions that are based on the EU Directive 2002 96 EC on Waste Electrical and Electronic...

Страница 36: ...17 G Gap width 24 General safety instructions 8 Grinding process 12 Grinding speed 25 H H41 H43 27 I Installation height 18 Installation of the machine 18 IP20 13 M Mains frequency 17 Manufacturer s...

Страница 37: ...Service Address 9 Setting the gap width 24 Setting the Speed 25 Starting the grinding process 26 Stopping the grinding process 26 Switching On and Off 23 T Target group 8 Technical data 11 Temperature...

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ...Copyright Copyright by Retsch GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany...

Отзывы: