INSTALLATION INSTRUCTIONS
SeaBat 7125 ROV Operator‟s Manual
Page 149
May 30, 2011
Version 3
B.5 SeaBat 7125 ROV Cables
A standard cable set is provided to connect the SeaBat 7125 ROV system components.
7125
Processor
Monitor
EM 7216
Receiver Unit
TC 2160
Projector Unit
Optional TC 2163
Projector Unit
3
2
3
Monitor
Monitor
Monitor
4
4
Link Control Unit
4
4
1
Figure 55: SeaBat 7125 ROV System Cables
Processor to LCU (1):
This cable allows power and data to be passed
between the LCU and processor. This cable has a standard length of 25
meters and a minimum bend radius of 180mm.
NOTE
Longer cable runs require a conversion to an optical signal
running over a single-mode fiber (see
appendix D.3 Fiber-Optic
Converter (for ROV Installations)
Receiver to LCU (2):
This cable allows a transmit pulse to be passed from
the LCU to the projector. This cable has a standard length of three meters and
a minimum bend radius of 90mm.
Projector to LCU (3):
This cable allows power and data to be passed
between the receiver and LCU. This cable has a standard length of three
meters and a minimum bend radius of 90mm.
CAUTION
Wet-end cables are rated to 700 bar, 100 cycles at full pressure. Please
change wet-end cables if this is exceeded. Contact RESON Service
Department for replacement cables.
Monitor to processor (4):
This cable allows data to be passed between
processor and monitor(s). If analog monitors are used a DVI to analog
converter is necessary (see also
section B.3.4 above
Содержание SeaBat 7125 ROV
Страница 2: ...This page intentionally left blank...
Страница 4: ...SeaBat 7125 ROV Operator s Manual Page ii May 30 2011 Version 3 This page intentionally left blank...
Страница 14: ......
Страница 63: ...SYSTEM CONFIGURATION SeaBat 7125 ROV Operator s Manual Page 47 May 30 2011 Version 3...
Страница 199: ......