INSTALLATION INSTRUCTIONS
SeaBat 7125 ROV Operator‟s Manual
Page 138
May 30, 2011
Version 3
CA
= Card alive
PN
= Ping now
1PPS = 1PPS
PRG = Programmed
ULN = Uplink
MDR = Motion data received
Figure 52: Processor Diagnostic LEDs
CAUTION
To disconnect the
host cable
from
the processor, first unscrew the
locking sleeve (at the left arrow)
before pulling the host cable out.
To disconnect the
SVP cable
from
the processor, hold on the groove
part of the connector (at the right
arrow) and pull gently outwards.
Do
not
pull directly on the cords, as
this will damage both cables and
processor.
Содержание SeaBat 7125 ROV
Страница 2: ...This page intentionally left blank...
Страница 4: ...SeaBat 7125 ROV Operator s Manual Page ii May 30 2011 Version 3 This page intentionally left blank...
Страница 14: ......
Страница 63: ...SYSTEM CONFIGURATION SeaBat 7125 ROV Operator s Manual Page 47 May 30 2011 Version 3...
Страница 199: ......