Tactical ResQmax Operation Manual
14
Figure 12b - Line Projectile with Bridle Lines
Bridle Lines
Quick-Link
“V” Groove
Figure 12a - Align "V" Groove
Align Nozzle Protector &
Mechanism Correctly
Loading the Line Projectile in the Launcher
To load the Line Projectile in the Launcher and connect the Bridle Lines, follow these steps:
1. Pull the Quick-Link connecting the two Bridle Lines in order to center the Bridle Lines evenly
on the left and right sides of the Projectile (Fig. 12b).
2. Ensure that the Safety Assembly is disengaged by pressing the Safety Push Knob.
3. Insert the Line Projectile into the Launcher with the “V” groove in the Nozzle Protector
upward while keeping the Bridle Lines tight and uncrossed along each side of the Projectile.
Rotate the Projectile as necessary until you feel the “V” groove engage with the Mechanism
(Fig. 12a) and apply pressure to the Projectile. An audible “Click” will signal that the Projectile
is properly inserted in the Mechanism with the Safety Assembly engaged and the Safety in
the
ON
position.
4. Connect the Quick-Link holding the loops in the Bridle Line to the loop in the “live end” of the
line – protruding through the notch on the Line Container Door. Use care not to disengage
the Cut-Away Pin which fastens the Line Container Door closed (Fig. 22, pg. 23).
Note:
If you do not
get the Nozzle
Protector lined
up properly
the Nozzle will
not be able to
slide into the
Mechanism.
An audible
“Click” indicates
the Safety
Assembly is
engaged and
the Safety is ON.