background image

Tactical ResQmax Operation Manual

10

Climbing Line and Tactical Ladder Options

In addition to the Climbing Line and Tactical Ladder options shown, customized Climbing 

Lines and Tactical Ladders are available to suit specific applications.

Pelican  Transport/Storage  Cases     

#908 and #909

These  unbreakable,  watertight,  dust-proof, 

chemical  resistant,  and  corrosion-proof  cases 

come with a lifetime guarantee. When equipped 

with an extending handle and rollers, these cases 

are used for transport and storage of your unit 

(Fig. 9).

Figure 8 - Kit Carry Bag #906

Kit Carry Bag #906

The  Kit  Carry  Bag  is  made  from  1000-denier 

Cordura  fabric,  with  two  external  zippered 

pockets,  one  internal  zippered  pocket,  and  a 

weatherproof membrane over the entire footprint 

(Fig. 8).

Figure 9 - Pelican Transport/Storage Case #908

 

 

 

 

 

 

 

 

 

               

     Minimum                Weight

Part #  Description 

                                 Break Load            per Length              Length

 

 

 

               

     lbs        kg                 lbs       kg               ft         m

801 

7mm Climbing Line 

802 

5.5mm Climbing Line

735 

40ft / 12m Standard Ladder

744 

50ft / 15m Tactical Ladder 

5,780

3,200

7,500

4,800

2,622

1,451

3,400

2,177

4.0

2.6

5.2

5.8

1.8

1.2

2.4

2.6

165

328

40

50

50

100

12

15

Figure 7 - 

Tactical Ladder

Tactical Ladder #735 and #744

Lightweight, durable, and acoustically covert. Constructed of high-tensity 
nylon  webbing  with  rungs  at  12  in/30  cm  on  center,  these  Ladders  are 
available in 40 ft / 12m or 50 ft / 15m lengths which can be fully deployed 
vertically (Fig. 7). 

NOTE: Custom lengths are available upon request.

Содержание Tactical ResQmax

Страница 1: ...Operation Manual The Global Leader in intrinsically safe line throwing equipment INC R E S CUESOLUTI O N S I N TERNATION A L ResQmaxTM the NEW Generation TACTICAL...

Страница 2: ...s or property are in the vicinity of the target The Tactical ResQmax requires proper training and servicing If you are not familiar with this equipment or are unwilling to follow the recommendations a...

Страница 3: ...ncher 11 Extending the Folding Stock 11 Collapsing the Folding Stock 11 Connecting the Launcher to the Line Container 12 Disconnecting the Launcher from the Line Container 12 Operating the Safety Push...

Страница 4: ...Climbing Grappling Hook for Deployment 24 Deployment 26 Deploying the Tactical ResQmax 26 Maintenance 27 Care of the Projectile 27 Care of the Launcher 27 Replacing the O Rings in the Nozzle Valve 28...

Страница 5: ...is Tactical ResQmax Operation Manual and accompanying Training CD prior to first use Applications Some applications of the Tactical ResQmax include Messenger Line Deployment Ship to Ship Line Deployme...

Страница 6: ...is not reusable and must be replaced if it should ever fail A second Pressure Relief Assembly is installed on the Launcher Mechanism and is active at all times when the Mechanism is pressurized A spar...

Страница 7: ...perator s ability to aim the Projectile more accurately Fig 2 When in the folded position the Folding Stock becomes a convenient carrying handle Fig 1 Figure 1 Launcher right side view Figure 2 Launch...

Страница 8: ...ied with each Tactical ResQmax to permit charging from multiple air sources if required ResQmax Tool Kit 990 TheoptionalResQmaxToolKit Fig 4 providesallthetoolsneededforoperationalmaintenance of the T...

Страница 9: ...iding protection for the projectile and reducing projectile bounce on contact Luminescent Training Projectile 306 S Fig 5b has factory installed luminescent protective cover which combines the best fe...

Страница 10: ...r Cordura fabric with two external zippered pockets one internal zippered pocket and a weatherproofmembraneovertheentirefootprint Fig 8 Figure 9 Pelican Transport Storage Case 908 Minimum Weight Part...

Страница 11: ...Fig 9a Step 2 The Stock Catch Plate will automatically engage and lock the Folding Stock in the extended position Collapsing the Folding Stock To collapse the Folding Stock for use as a handle follow...

Страница 12: ...oth the front and rear grooves of the Line Container simultaneously Push firmly forward until the Line Container Catch on the Launcher automatically engages in the locking hole in the Line Container F...

Страница 13: ...ety Push Knob to the OFF position immediately before firing the Launcher When the safety is in the OFF position the Safety Push Knob remains recessed inside the cavity about 6 mm Fig 11b After firing...

Страница 14: ...zzle Protector upward while keeping the Bridle Lines tight and uncrossed along each side of the Projectile Rotate the Projectile as necessary until you feel the V groove engage with the Mechanism Fig...

Страница 15: ...e rotate the Valve Key 90 in a clockwise direction Fig 14 Step 2 After rotating full 90 release the Valve Key allowing it to extend fully and disengage from the Nozzle Valve Fig 13a Opening the Nozzle...

Страница 16: ...red operating pressure is achieved 4 Rotate the Bleed Screw Handle in a clockwise direction to stop the escape of air The second purpose of the Bleed Screw is to permit the operator to bleed off the p...

Страница 17: ...ted for damage Damaged Protectors should be replaced to protect the Projectile Cylinder Figure 17a Projectile Protector Figure 17b Damaged Training Projectile Cover Figure 17c Damaged Projectile NOTE...

Страница 18: ...rojectile to be filled If the Valve Key is in line with the flow of air then the Valve is OPEN Fig 18a To charge the Projectile follow these steps 1 Connect the appropriate Filler Hose Adapter to the...

Страница 19: ...erpendicular to the flow of air Fig 18g Always replace the Filler Hose Wrench back in the retainer on the Filler Hose 10 Next locate the drain port adjacent to the red Bleed Screw on the Filler Block...

Страница 20: ...is being maintained CAUTION IftheProjectilesaresubjectedtoextremeheat thepressurecouldrise sufficientlytorupturethePressureReliefAssemblyallowingtheairtoescapeand temporarily preventing use of the equ...

Страница 21: ...1 Disengage the Safety Assembly by pressing the Safety Push Knob 2 Pull the Trigger to release the Projectile into your hand or the ground With pressure indicated on the Launcher Pressure Gauge If yo...

Страница 22: ...hedoor open toward you 2 Allow12inches 30cmofthe deadend oftherope fitted with the snap shackle to hang freely outside of the right side of the Line Container Fig 19a and begin dropping the line insid...

Страница 23: ...Cut Away Pin holds the Line Container Door closed until deployment automatically releasing the door of the Line Container to allow the line to follow the Projectile without resistance Climbing Lines a...

Страница 24: ...ll the Grappling Hook over the end of the Projectile Align the V groove of the Nozzle Protector at 90 to the Eyelet of the Grappling Hook to keep the Line oriented correctly Fig 23b 3 RuntheLinealongt...

Страница 25: ...8 Re engage the Cut Away Pin to fasten the Line Container Door closed 9 Using the Quick Link on the Bridle Lines attachtheBridleLinestotheloopcontaining the Cut Away Pin on the Line Fig 23f 10 Connect...

Страница 26: ...t and are too short to deploy horizontally at full service pressure A Climbing Line deployed horizontally at full service pressure will reach full extension in approximately one second and apply a con...

Страница 27: ...e Corrosion Block can be used on any part of the Projectile Each Projectile Cylinder is intended to have a maximum service life of five years from the date of manufacture and must be removed from serv...

Страница 28: ...e Body 3 Remove the Nozzle Plug Retaining Clip from the Nozzle Valve Plug using Retaining Clip Pliers 4 Push the Nozzle Valve Plug out of the Nozzle Body Lower O ring 60405 Nozzle Valve Retaining Clip...

Страница 29: ...ervice or performance Figure 27 Nozzle Valve Plug Face O ring 60406 Upper Lower O rings 60405 Installing the Nozzle Plug Valve O rings with the Installation Tool 1 Remove and discard the Upper Lower a...

Страница 30: ...damage 4 Reinstall the Pressure relief Assembly Fig 26 pg 28 6 Slide the Nozzle Protector over the Nozzle Body taking care to ensure that the aligning notch on the Nozzle Body is engaged with the matc...

Страница 31: ...iring and each discharge of a Cylinder Nozzle Assembly The Manufacturer recommends that this equipment be serviced by technicians trained and certified by the Manufacturer in the maintenance and repai...

Страница 32: ...e in service However units subjected to more frequent use such as training programs demonstration equipment and equipment used as a tool in commercial applications on a frequent or daily basis or unit...

Страница 33: ...the Nozzle Valve If the Pressure Gauge shows pressure then it is charged and you may proceed to shoot or close the Nozzle Valve and remove the Projectile It is a good idea to develop a system to ensur...

Страница 34: ...c distributor for assistance When you prepare to fire the Launcher the Mechanism is underpressure Ifyouapplystrongfingerpressureagainst theTrigger prior to releasing the Safety the air pressure in the...

Страница 35: ...ns International Inc will repair or replace your Tactical ResQmax or otherwise notify you within 30 days of receipt of the Tactical ResQmax Any actions for breach of warranty or breach of contract mus...

Страница 36: ...lon 165 50 7 1 5 780 2 622 4 3 2 802 HMPE and Nylon 330 100 5 5 1 3 200 1 194 5 2 2 6 803 Spectra 500 152 4 1 1 500 680 1 75 0 8 804 Spectra 500 152 6 1 3 000 1 360 3 5 1 6 805 Dacron 500 152 3 1 500...

Отзывы: