![Renewable Energy Global 2009122A Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/renewable-energy-global/2009122a/2009122a_installation-manua_1440958007.webp)
6
INSTALLATION MANUAL FOR MODEL: GSE IP-195
oPen BoX InsPeCTIons
2. Open Box Inspections
One IP-195 unit is delivered in 5 cardboard boxes as shown below:
Boxes Illustration
Box 1: Tank Box Contents
Box 5: Heat Pipe Box Contents
Heat Pipes
(24 Pieces in one box)
Reflectors (4 Pieces)
End Brackets Bar(1 Piece)
Water Tank (1 Unit)
Box 1: Tank Box
Water Tank (1 Unit)
Reflectors (4 Pieces)
End Brackets Bar (1 Unit)
Box 2 and 3: Tube Box
Evacuated Glass Tubes
(12 Pieces per box
Φ=47mm length=1500mm)
Box 4: Frame Box
Frame Bars, Bolts and Nuts
Tube Seal Rings (24)
Heat Pipe Seal Rings (24)
Ground Cable (1 Piece)
Lock Bolts (24 Pieces)
Box 5: Heat Pipe Box
Heat Pipes (24 Pieces)