![Renewable Energy Global 2009122A Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/renewable-energy-global/2009122a/2009122a_installation-manua_1440958012.webp)
11
INSTALLATION MANUAL FOR MODEL: GSE IP-195
4. Assembling Frame
Join five frame bars into a “A” shape frame. Note that the rear legs have different length: full length for flat
roof sitting and shortened length for pitched roof sitting. Rear legs can be cut to fit a specific roof pitched
slope.
End Caps (24 pieces)
“A” shape Frame For Flat Roof
AsseMBlInG FRAMe
Flat Roof Frame
Frame Assembly steps:
1.
Assemble “A” shape frame as shown above on an open grand space
2.
Attach rear cross enforce bars (2 pairs with 4 pieces of bars)
3.
Attach reflectors (4 pieces)
4.
Attach end brackets bar and caps (1 end bracket bar with 24 caps)
5.
Attach leg pads ( 6 pieces)
6.
Lift the frame to the system mounting location
7.
Mount the leg pads to the roof mounting system attached to the roof beams
Cross enforce bars (2 pairs)
Reflectors (4 pieces)
Water Tank Shoulder Rest (3 Pieces the
facing direction is different between the
right rest bar and left rest bar)
Top Reinforce Bars (3 Pieces)
Middle Reinforce Bars (3 Pieces)
Bottom Reinforce Bars (3 Pieces)
Rear Leg Bars ( 3 Pieces)
Front Leg Bars ( 3 Pieces)
Leg Pads ( 6 Pieces)