Renewable Energy Global 2009122A Скачать руководство пользователя страница 5

4

INSTALLATION MANUAL FOR MODEL: GSE IP-195

1.5 

specific notices

1.5.1  Aux Hot Water Heater  

The system is not a replacement of the existing Aux Hot Water Heater. It is installed at the upstream of the existing 

conventional hot water heater. The Aux Hot Water Heater must be maintained as usual. The Aux water heater must 

have adequate capacity, listed and labeled by a accredited listing organization. The Aux water heater should have 

the proper built in insulation by the accredited organization. If the Aux Water Heater doesn’t come with the insula

-

tion, it should covered with minimum R2.2 insulation with thickness of 1/4”. (GUIDE: 6.1.1.4)

1.5.2  System Tank (GUIDE: 6.1.3.2) 

The direct system comes with 40 gallons tank, no heat exchange, hence no extra tank is needed. 

1.5.3  Heat Transfer Fluid (HTF) inside the heat pipe (GUIDE: 6.1.3.6 and 6.3.7)

The HTF inside the heat pipe is a small amount of pure water at a very low pressure. The heat pipe, HTF are built as 

one unit, no refill is needed, and the water inside will not be reduced.

No other fluid shall be used that would change the original classification of this system. Unauthorized alterations to 

this system could result in a hazardous health condition.

1.5.4  Temperature Sensor Wiring and System Monitoring (GUIDE: 6.1.5.5 and 6.4.1)

Connect each of the temperature sensor with the cold water pipe and hot water pipe respectively. Put one-foot 

R4.4 insulation on both sensors. The sensor and pipe intersection point should be in the middle of the one foot 

insulation.

To determine whether the solar system is working, observe the thermometer when the hot water is being used in 

the house. The water returning from the collector on a sunny day should be at least 10 Fahrenheit warmer than the 

water going up to the collector. The temperature of the cold water and hot water is displayed on the monitor. 

 1.5.5  The insulation of the final 5 feet to the auxiliary water heater (GUIDE: 6.1.6.3)

The insulation of the final 5 feet to the auxiliary water heater is R2.2 with thickness of 1/4”.

1.5.6  Public Traffic Statement (GUIDE: 6.3.1.7)

Components exposed to public traffic should be maintained below 140 F or insulated/isolated to prevent any haz

-

ards to the public traffic.

1.5.7   Components accessibility (GUIDE: 6.4.6)

All components should be accessible for maintenance and servicing. 

1.5.8  Installation and Maintenance Practices (GUIDE: 6.5.5 and 6.5.10)

Do not impair enclosure function. Do not allow vermin intrusion. Ensure to meet applicable codes and national 

Roofing Contractors Assoc. practices. The entire system should be checked by the installer once every two years.

Follow the specific codes and practices to penetrate the structural members for the solar system.

1.5.9   Safe practices (GUIDE: 6.5.11)

Building materials adjacent to solar components are not exposed to elevated temperatures.

1.5.10  System mounting (GUIDE: 6.5.12, 6.5.13, 6.5.14 and 6.5.19)

Allocate a place is not shaded during 10:00AM to 3:00PM, and keep the solar panel facing south with 45 degrees of 

adjustment tolerance. The pitched degree of the panel should be close to the latitude of the location.

All the piping should proper support according to the plumbing codes. These supports must not compress the insu

-

lation. 

Any structural member or fire rated assembly should not be reduced after penetration during the installation. It will 

be up to the local code to dictate exactly how this is done. The outdoor pipes should be insulated with R6.6 insula

-

tion with thickness of 1 inch. The indoor pipes should be insulated with R2.2 with thickness of 1/4”.

1.5.11  Projected components need to be replaced

The glass vacuum tubes (Part # IP-195-011) might need to be replaced after it is broken by the unexpect

-

ed hazards, such as hit by the hard material. Please contact to the installer to order the parts and do the 

replacement. The battery of the temperature monitor needs to be replaced when the battery is out. The 

battery can be purchased at store.

sPeCIFIC noTICes

Содержание 2009122A

Страница 1: ...LISH Model GSE IP 195 INSTALLATION MANUAL RENEWABLE ENERGY GLOBAL INC http www renewableenergyglobal com Integral Evacuated Tube Solar Water Heater Version 1 8 Models IP 195 2009122A and IP 195G 20091...

Страница 2: ...nty 5 5 Open Box Inspections 6 6 Valve Labels 8 7 Components Description 10 8 Assembling Frame 11 9 Assembling 13 10 Pitched Roof and Footprint Dimensions 14 11 Roof Mounting Details 15 12 Roof Load D...

Страница 3: ...omplete the general and product specific training provided by Renewable Energy Inc prior to the installation 2 Have a licensed plumber to install the plumbing connections 3 Obtain the necessary permit...

Страница 4: ...ves V0 V2 V4 and shut off the following valves V1 V3 V5 Step 3 Keep the water running for 5 minutes to flash out the solder or stains after the water from V4 is observed Step 4 Shut off V4 and Open V3...

Страница 5: ...et to the auxiliary water heater GUIDE 6 1 6 3 The insulation of the final 5 feet to the auxiliary water heater is R2 2 with thickness of 1 4 1 5 6 Public Traffic Statement GUIDE 6 3 1 7 Components ex...

Страница 6: ...2009122B Same Manual System Warranty Labor Warranty One year It might be various for different installers Components Warranty Five Years Warranty HOW TO OBTAIN WARRANTY CLAIM SUPPORT Verify the warra...

Страница 7: ...s Heat Pipes 24 Pieces in one box Reflectors 4 Pieces End Brackets Bar 1 Piece Water Tank 1 Unit Box 1 Tank Box Water Tank 1 Unit Reflectors 4 Pieces End Brackets Bar 1 Unit Box 2 and 3 Tube Box Evacu...

Страница 8: ...Pipe Seal Rings Box 2 3 Tube Box Contents Box 4 Frame Box and Accessary Contents Tube Rings Lock Bolts Valve Tags Leg Pads Bolts and Nuts Tank Shoulder Rests Double Layers of Glass Evacuated Tube Alu...

Страница 9: ...8 INSTALLATION MANUAL FOR MODEL GSE IP 195 VALVE LABELS Valve List and Labels...

Страница 10: ...9 INSTALLATION MANUAL FOR MODEL GSE IP 195 Valve Lables 2...

Страница 11: ...la tion layer effectively prevent the energy lose and maintain the tank water temperature self sustainable during continuous unclear days in the cold winter time The surface appearance layer is made o...

Страница 12: ...n grand space 2 Attach rear cross enforce bars 2 pairs with 4 pieces of bars 3 Attach reflectors 4 pieces 4 Attach end brackets bar and caps 1 end bracket bar with 24 caps 5 Attach leg pads 6 pieces 6...

Страница 13: ...Rear Leg Middle Piece Should Rest Bar Right Piece Rear Leg Right One Reinforce Bars 3 sets 3 pieces per set Front Leg Left Piece Reflectors 4 Pieces End Bracket Bar 1 Unit Lock Bolts 24 Pieces Heap Pi...

Страница 14: ...unshine directly before the installation Roll the tank to ensure the line between the end bracket cap and the hole in the tank is parallel with the reflec tors as illustrated in a diagram below Put th...

Страница 15: ...orm safe operations to prevent from injury during installations 9 Roof Mounting Appearance and Penetration Required roof penetrations shall be made in accordance with applicable codes and also by prac...

Страница 16: ...ated assemblies The intent of these paragraphs can be met with statements in the installation portion of the manual instructing the installer to run the piping in such a way that the performance of an...

Страница 17: ...es minimum Type of screws Corrosion resistant deck screws Corrosion protection stainless steel or hot dipped galvanized screws that meet ASTM standard of A153 or A 653 or polyester coated screws like...

Страница 18: ...4444 30 Pipe Heating Cable With Thermostat M D Building Products 64444 30 Pipe Heating Cable With Thermostat Features UL and CSA approved pipe heating cable designed to prevent water line freeze up Re...

Страница 19: ...to V5 must be installed at an adults reachable place Draining valves V4 V5 must come with hose bibs that can connect a garden hose for draining purpose Kitchen Washer Bath Shower Solar Isolation Valve...

Страница 20: ...olation Valve T P Release Valve Poly Adapter Solar Water Tank Note The above diagram is one of many possible ways to install the T P release valve It is subjected to changed according to the local plu...

Страница 21: ...and with minimum outside exposure length It should be lined up through the attic and interior walls However in case it is hard to wire through interior walls the pipes can run along an external wall a...

Страница 22: ...or is P D COR PORATION http www tandd co jp The model isR 71Ui The manual is available at the company website SYSTEM CONFIGURATION Kitchen Washer Bath Shower Laundry M1 V1 V2 V3 V4 V5 City Water Cold...

Страница 23: ...p roof IP 195 040 Shoulder rest 3 5 IP 195 041 Leg Pad 6 5 IP 195 042 Tube Ring 24 5 IP 195 043 Large seal ring 24 5 IP 195 044 Small seal ring 24 5 IP 195 045 Bolts and nuts 6 x 12 mm 63 5 57 for pit...

Страница 24: ...mittance 7 100 C Insulation Polyurethane 55 mm Solar Collecting Area 24 Square Feet SF Vacuum P 0 005 Pa Stagnation Temperature 220 C Heat Loss 0 08 W SF Tested Pressure 150 PSI Working Pressure 79 PS...

Страница 25: ...ut the prior written consent of the Renewable Energy Inc including but not limited to Transmission by any method storage in any medium system or program display in any form performance hire lease rent...

Отзывы: