
R11UM0156EJ0240 Rev.2.40
Page 53 of 82
Jul. 28, 2020
PRIME v1.4 Base Node Tool
User Manual
Renesas Electronics Group Confidential
3
.
PC Tool operation procedure
PRELIMINARY
Notice This is not a final specification. Some
parametric limits are Subject to change.
3.10 Reset Sub-network
(1) Push Reset Button of G-CPX3 board.
(2) Wait until LED turns ON (About 3 sec).
(3)
Push “Reset” button of “prime14_cpx3_pc_bn_RevXXX.exe”.
(4) If BEACON.REQ and BEACON.CON is displayed, BN becomes ready.
(5)
If BEACON.REQ is not shown, shutdown “prime_pc_demo.exe” and restart “Base Node setting”.
Figure 3.48 G-CPX3 board reset
Figure 3.49 Console screen after G-CPX3 board and PC tool reset