R11UM0156EJ0240 Rev.2.40
Page 17 of 82
Jul. 28, 2020
PRIME v1.4 Base Node Tool
User Manual
Renesas Electronics Group Confidential
3
.
PC Tool operation procedure
PRELIMINARY
Notice This is not a final specification. Some
parametric limits are Subject to change.
(7) Select COM Port BN connected.
Figure 3.5 PC tool screen after COM Port is connected
(8) Wait until the status LED turns on (immediately the COM Port selected).
(9) Connect the G-CPX3 boards of SN to the power line and power on.
(10) Wait until all SNs are registered to the network.
Figure 3.6 Network tree window after SNs are registered (PRIMEv1.4 setting)