
DOC2012/2000en
19
4 Delivery and transport
4
.1 Delivery
Before delivery, the R2000 boiler is fully assembled and tested in the factory. The R2000 is mounted on a
pallet and covered in a “heat-shrink” protective wrapper.
Check for damage after removing the boiler’s protective covering.
Check whether the boiler conforms to the order requirements.
Check whether the circuit diagram and gas-train diagram number is in accordance with the offer,
order confirmation and the data on the boiler’s data number plate.
4.2 Unit protective packaging
The boiler is mounted on a wooden pallet. For transportation the boiler is covered in a “heatshrink”
protective covering. The panel-work is also covered in a protective polyethylene layer.
Before final installation in the boiler room the boiler must be removed from the pallet and all protective
coverings removed.
The protective coverings should be disposed of in a environmentally friendly way.
Contact your local authority.
4.3 Transport
Refer to the technical specifications on weight and dimensions when transporting the boiler.
WARNING:
-
Incorrect moving or lifting of the boiler may cause damage
-
Remove the protective covering after transport and installation in the boiler room.
Pallet cart and/or forklift truck
When moving the boiler with a pallet cart or forklift truck, the forks should be placed at a front
of the boiler
E
Fig. 10 Moving
Содержание R2000 Series
Страница 50: ...DOC2012 2000en 50 Notes...
Страница 51: ...DOC2012 2000en 51 Notes...