REMKO DZ 18 HD Скачать руководство пользователя страница 7

Attention, important hints to the after-cooling phase 

The air supply fan continues running to cool down the 
combustion chamber and then stops later. 

The fan can start several times before final switching off.

 

Unit Shut Down

 

Heating with room thermostat (accessories) 

The unit runs fully automatically and depending on tem-
peratures. 

1.  Remove the bridge circuit plug 

3

2.  Connect thermostat plug 

5

 of the 

room thermostat (accessories) to 
the thermostat socket 

4

3.  Install room thermostat 

6

 in a suit-

able place. 

The thermostat sensor may not be 
exposed directly to the hot air cur-
rent and not fixed directly on a cold 
surface.

 

4.  Pre-select desired room tempera-

ture on the room thermostat 

5.  Put the operating switch into position 

“1” (on). 

1.  Put operating switch into position 

“0” (OFF). 

Setting the pump pressure 

The pump pressure can only be set if a manometer is 
connected to the connection 

P

. The pump pressure is 

changed by turning the pressure setting screw 

A

clockwise:                         increase the pressure. 
counter clockwise:            reduce the pressure. 

The required pump pressure is determined according to 
the heating capacity (please refer to unit type plate) and 
to the nozzle size. The pressure setting screw "A" is to 
be secured with the counter nut "B" after having set the 
pressure. 

Fuel Pump

 

 
The standard type of the pump runs in a system of  
1 pipe. The required fuel is sucked in through the suction 
line "S". 

For the first starting and after having emptied the fuel 
tank, the fuel system is deaerated through the burner 
nozzle. 

For this purpose the unit is switched on. After a possible 
switch off through failure, the unit is restarted after hav-
ing released the automatic burner relay (take care of 
waiting time). 

If, after the 3rd start of the unit there is another switch 
off through faults, the fuel filters should be checked to 
make sure that they are free from pollutions and that 
they are tight. 

G

 

Perfect fuel quality is an absolute necessity for the 
lubrication of the pump drive.      
Suction of water residues should never take place 
and, in the case of setting, suction should not take 
place of warping fine dusts (e.g. cement etc.).  

G

 

Never let the pump run without feeding fuel for a 
longer period. Make sure not to leave a unit with 
dry run pump unattended for a longer time. 

Filter 

Gasket 

Cover 

Heating without room thermostat 

The unit runs in continuous operation. 

2.  Put the operating switch into position 

“1” (on). 

1.  Connect the supplied bridge circuit 

plug 

3

 to the thermostat socket 

4

 of 

the unit 

G

 

Never interrupt (except in emergency situations) 
the connection to the mains before the end of the 
whole after-cooling phase. 

Our guarantee does not cover damages caused 
to the unit by overheating. 

Содержание DZ 18 HD

Страница 1: ...REMKO powerful like a bear REMKO DZ 18 HD Automatic oil heater Edition GB M04 Operation Technology Spare Parts...

Страница 2: ......

Страница 3: ...t list 11 Wiring diagram 12 Service and guarantee 12 Troubleshooting 13 Maintenance log 14 Automatic oil heater REMKO DZ 18 HD Make sure to read these instructions carefully before starting using the...

Страница 4: ...upply air fan contin ues running for some time to cool down the combustion chamber and then it stops automatically Depending on the required heat rate the function de scribed above is repeated automat...

Страница 5: ...ated in rooms and areas where the danger of fire or explosion ex ists 3 Room drying 3 1 In deviation from point 2 3 in order to dry rooms with an air supply sufficient for the combustion heating units...

Страница 6: ...a special supply point with fault current safety switch Starting Prior to starting the unit is to be checked to make sure that there are no visible defects on the control and safety devices that the...

Страница 7: ...ng set the pressure Fuel Pump The standard type of the pump runs in a system of 1 pipe The required fuel is sucked in through the suction line S For the first starting and after having emptied the fue...

Страница 8: ...ervals Maintenance and Service The unit is to be maintained regularly whereby some fundamental rules are to be observed to ensure a long service life and trouble free operation After each heating peri...

Страница 9: ...hoto cell and ignition cable and remove the burner head by turning from the rear wall of the burner chamber 3 When maintenance has been carried out re assemble all parts carefully in reverse order 4 P...

Страница 10: ...31 24 26 27 25 28 33 34 36 37 37a 42 41 47 48 50 49 46 13 44 15 19 43 6 3 2 45 9 10 18 4 8 14 35 5 39 38 40 32 51 52 54 53 22 We reserve the right to make modifications in dimensions and construction...

Страница 11: ...with plug 1101320 25 traction relief 1108325 26 bridge circuit plug 1101019 27 thermostat socket 1101018 28 fan housing 1101803 29 filler cap 1101716 30 fuel filter filler neck 1101717 31 control IC...

Страница 12: ...r or his customer has filled in completely the guarantee certificate which is enclosed with every REMKO heater and has returned it to REMKO GmbH Co KG in due time after the unit s sale and commissioni...

Страница 13: ...ng dimension type size Replace nozzle take care of correct type and size 11 Wrong setting of ignition electrodes or damaged insulation Adjust correctly resp replace it 12 Air flow plate of the burner...

Страница 14: ...ge Check fastening screws Electric safety inspections Test run Model Model No Setting and maintenance work is to be carried out only by authorised specialists Remarks 1 Date 2 Date 3 Date 4 Date 5 Dat...

Страница 15: ......

Страница 16: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606260...

Отзывы: