REMKO DZ 18 HD Скачать руководство пользователя страница 5

Provision for Air Heaters 

 
For the deployment of the unit, the relevant guidelines 
must be observed 

1.      Operating personnel 

1.1    The unit must only be operated by persons who 

have been trained in its operation. 

 

2.      Installation 

2.1    The unit must be installed so that it can stand in a 

stable position. 

2.2    The unit must be installed and operated in such a 

way that the employees are not  exposed to the 
danger of exhaust gases and radiant heat and that 
the occurrence of fires is ruled out. 

2.3    The unit may only be installed and operated in 

rooms if a quantity of air sufficient for the combus-
tion is supplied to the unit and the exhaust gases 
are removed to the exterior. 
A natural air supply sufficient for the combustion is 
present if e.g. 

The room contents in m² correspond with at least 
10 times the nominal heat load in kW of all the 
units operating in the room and if windows and 
doors ensure a natural change of air. 

2.4    In deviation from point 2.3, the unit can be oper-

ated without an exhaust system in rooms if these 
rooms have a sufficient air supply and are well ven-
tilated and if materials harmful to health do not 
reach an unhealthy concentration. 

A good natural air supply and ventilation is the case 
if e. g. 

The room contents in m² correspond with at least 
30 times the nominal heat output of all units op-
erating in the room and a natural change of air is 
ensured through windows and doors, or 
openings which are not lockable are present in 
the region of ceiling and floor for the air supply 
and for out going air and the size of these open-
ings in m² corresponds with at least 0.003 times 
the nominal heat output in kW of all units operat-
ing in the room. 

2.5    The unit must not be installed or operated in rooms 

and areas where the danger of fire or explosion ex-
ists. 

 

3.      Room drying 

3.1    In deviation from point 2.3, in order to dry rooms 

with an air supply sufficient for the combustion, 
heating units can be operated without the exhaust 
gases being removed to the exterior. In these 
rooms, the permanent presence of persons is for-
bidden. Signs on the entrances to the rooms must 
indicate that this is forbidden.

 

4.      Examination 

4.1    The unit must be tested by an expert as to its work 

safety specific condition in accordance with the re-
quired deployment conditions but at least once an-
nually. 

4.2    The exhaust values of the burner must be checked. 
 

5.      Monitoring 

5.1    When starting work, the persons commissioned 

with the operation of the unit must check the unit 
for obvious defects or deficiencies on the opera-
tional and safety mechanisms and check that the 
safety mechanisms are present. 

5.2    If defects or deficiencies are discovered, the super-

visor must be informed. 

5.3    In case of defects or deficiencies which endanger 

the operational safety of the unit, its operation must 
be terminated. 

 

6.      Installation in closed, well aerated rooms with-

out connection to a chimney

 

6.1    The operation of the units is admissible when the 

minimum air quantity needed for combustion and 
mentioned in point 2.4 is supplied. 

6.2    A safe exhaustion of the waste gases is to be en-

sured to exclude inadmissible pollution. 

Fresh air

 is fed from 

below

waste gases

 are exhausted towards the 

top

 

7.      Correct usage 

7.1    The units are to be used only for heating purpose in 

industrial or commercial application because of their 
construction and equipment. 

7.2    If specification of the manufacturer or legal regula-

tions, are not followed or if unauthorised changes 
are made on the unit, the manufacturer is not liable 
for resulting damages.

 

G

 

The unit is to be installed only in well aerated 
rooms, but not in living rooms or similar recreation 
rooms! 

Содержание DZ 18 HD

Страница 1: ...REMKO powerful like a bear REMKO DZ 18 HD Automatic oil heater Edition GB M04 Operation Technology Spare Parts...

Страница 2: ......

Страница 3: ...t list 11 Wiring diagram 12 Service and guarantee 12 Troubleshooting 13 Maintenance log 14 Automatic oil heater REMKO DZ 18 HD Make sure to read these instructions carefully before starting using the...

Страница 4: ...upply air fan contin ues running for some time to cool down the combustion chamber and then it stops automatically Depending on the required heat rate the function de scribed above is repeated automat...

Страница 5: ...ated in rooms and areas where the danger of fire or explosion ex ists 3 Room drying 3 1 In deviation from point 2 3 in order to dry rooms with an air supply sufficient for the combustion heating units...

Страница 6: ...a special supply point with fault current safety switch Starting Prior to starting the unit is to be checked to make sure that there are no visible defects on the control and safety devices that the...

Страница 7: ...ng set the pressure Fuel Pump The standard type of the pump runs in a system of 1 pipe The required fuel is sucked in through the suction line S For the first starting and after having emptied the fue...

Страница 8: ...ervals Maintenance and Service The unit is to be maintained regularly whereby some fundamental rules are to be observed to ensure a long service life and trouble free operation After each heating peri...

Страница 9: ...hoto cell and ignition cable and remove the burner head by turning from the rear wall of the burner chamber 3 When maintenance has been carried out re assemble all parts carefully in reverse order 4 P...

Страница 10: ...31 24 26 27 25 28 33 34 36 37 37a 42 41 47 48 50 49 46 13 44 15 19 43 6 3 2 45 9 10 18 4 8 14 35 5 39 38 40 32 51 52 54 53 22 We reserve the right to make modifications in dimensions and construction...

Страница 11: ...with plug 1101320 25 traction relief 1108325 26 bridge circuit plug 1101019 27 thermostat socket 1101018 28 fan housing 1101803 29 filler cap 1101716 30 fuel filter filler neck 1101717 31 control IC...

Страница 12: ...r or his customer has filled in completely the guarantee certificate which is enclosed with every REMKO heater and has returned it to REMKO GmbH Co KG in due time after the unit s sale and commissioni...

Страница 13: ...ng dimension type size Replace nozzle take care of correct type and size 11 Wrong setting of ignition electrodes or damaged insulation Adjust correctly resp replace it 12 Air flow plate of the burner...

Страница 14: ...ge Check fastening screws Electric safety inspections Test run Model Model No Setting and maintenance work is to be carried out only by authorised specialists Remarks 1 Date 2 Date 3 Date 4 Date 5 Dat...

Страница 15: ......

Страница 16: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606260...

Отзывы: