11
Commissioning
A person, who has been
adequately trained in the handling
of the units, must be tasked with
operation and monitoring of the
units.
Connecting the units to the
electrical power supply
1. Move the operating
switch to the "0" (off)
position.
2. Connect the power
plug to a properly
installed and
appropriately
safeguarded mains
socket.
230 V/50 Hz
3. Open all of the oil supply shut-
off devices.
With the initial commissioning,
air in the oil lines can lead to a
fault shut-down of the burner.
Heating without room
thermostat
The units are operating in
permanent operating mode.
1. Connect the strapping plug
supplied 2 with the thermostat
receptacle 1 on the unit.
2. Move the operating
switch to the "I"
(Heating) position.
s
s
s
2
1
Control panel
1
2
9
8
7
6
5
1 = Thermostat receptacle
2 = Strapping plug
5 = Operating switch
6 = Indicator light "GREEN"
"Operation"
7 = Indicator light "RED" "Burner
fault"
8 = Reset button "Burner"
9 = Mains cable with plug
■
There should be no kinks or
bends in the hose lines in order
to prevent hot-spots forming.
Membrane hoses must not be
twisted
■
Enclosed spaces being heated
via hoses must not present any
overpressure
■
The forced-air burner can be
switched off briefly during
operation by the temperature
monitor (TW) in the event of
increased intake temperatures
or resistance at the unit's outlet.
After the temperature drops
again the burner restarts
automatically!
■
If the cycle intervals are too
short the length and layout of
the hot air ducting should be
checked
NOTE
Air feeds on the intake side
must always be implemented
by means of non-distorting
hoses/ducts (no unstable
hoses).
NOTE
Cold start
With the CLK 30 to CLK
70 units fitted ex works
with a blower oil burner,
a temperature-dependent
delayed device start takes
place due to the preheating of
the nozzle block.
CAUTION
If a build-up of heat should
occur then the heating
operation will be interrupted
by the STB permanently!
CAUTION
Never interrupt the mains
connection (except in emergencies)
prior to the completion of the
follow-up cooling phase.
NOTE
Cycled operation of the
forced-air burner with run
times under 5 min. must in any
event be avoided.
CAUTION
All cable extensions must only
be used in fully un-reeled or
reeled off condition.
!
!
!