Remeha Quinta 85
30
7 INSTALLATION
INSTRUCTIONS
7.1 General
All gas appliances must, by law, be installed by a competent qualified engineer
registered with CORGI and holding the relevant qualifications and certificates (for
example ACOPS and IEE regs.)
The complete installation must comply with the current editions of relevant British
Standards and codes of practice, including the latest local and national regulations for
this type of equipment.
Important:
The Remeha Quinta 85 is a CE certified appliance and must not therefore be modified
or installed in any way contrary to these “Installation and Maintenance Instructions”.
These manufactures Instructions must NOT be taken as overriding statutory
obligations. Failure to install this appliance correctly could result in an unsafe condition
which can lead to prosecution. It is your own interest and that of safety to ensure that
the law is complied with.
7.2 Location
The remeha Quinta 85 is primarily designed
for wall mounting (on the bracket supplied).
The wall should be flat, vertically plumb and
capable of supporting the full weight of the
boiler full of water. An optional floor frame
can be used for a free standing installation or
where the wall cannot carry the weight.
The following minimum clearances are
required:
- Front: 600 mm
- Sides: 25 mm
- Bottom: 250 mm
- Top: 400 mm.
Fig. 05
Minimum clearances around
the
boiler
05.W4H.79.00026