Remeha Quinta 85
24
*
Modulation start point
∆
T (F/R)
05
-
30
ºC
25
(
Interface selection (control
option)
00
internal
(Chronotherm control only)
01
01
external interface
B
DHW cut-in
∆
T
10
–
05
read 1 - 5 °C
06
read 10 °C
07
read 15 °C
08
read 20 °C
05
C
Fan speed at full load (DHW)
10
–
70
hundreds
62
D
Intern
May not be changed!
00
E
N/a
)0
(=100)*
F
N/a
20
G
Forced part load time after start
(HTG)
00
–
15
minutes
03
H
Fan speed at start
May not be changed!
20
I
DHW control stop or boiler
modulation set point (based on
parameter
#
)
00
–
30
°C
20
J
DHW control option
00
= Three way valve
(port A = HTG,
port B = DHW)
01
= DHW pump
02
= inverted three
way valve
(port A = DHW,
port B = HTG)
01
L
Variable speed pump
n/a
)3
N
HTG cut in
∆
T
1)
(= -10°C) –
20
°C
03
O
N/a
10
P
Boiler type
May not be changed!
80
T
Intern
May not be changed!
01
U
Maximum delay time
00
–
99
minutes
15