5
PREFACE
These technical instructions contain useful and important information for the correct
operation and maintenance of the Remeha HTG boiler, model Quinta 85.
Read these instructions carefully before putting the boiler into operation, familiarise
yourself with it’s control functions and operation, strictly observing the instructions
given. Failure to do so may invalidate warranty or prevent the boiler from operating.
The installation and commissioning of the boiler must be carried out by a competent
Engineer, with the relevant certification ie: CORGI, ACOPS, IEE regs. etc.
On completion a copy of the commissioning sheet should be returned to Broag Ltd for
record purposes.
If you have any questions, or if you need more information about specific subjects
relating to this boiler, or it’s installation please do not hesitate to contact us.
The data published in these technical instructions is based on the latest information (at
date of publication) and may be subject to revisions.
We reserve the right to continuous development in both design and manufacture,
therefore any changes to the technology employed may not be retrospective nor may
we be obliged to adjust earlier supplies accordingly.