V E C T O R
O W N E R ’ S
M A N U A L
Page
• 28
7
. Make sure the pilot chute is centered over
the loop, then compress it straight down and
lock it with the temporary pin.
4
. Close the inside top kicker flap (Flap #2)
and secure it with the temporary pin. The
bridle should come out between Flap #1 and
Flap #2. Check the amount of free bridle
extending from the closed flaps to the base
of the pilot chute; there must be at least 5
feet (1.5m). If there is less than 5 feet (1.5m),
reopen the flaps and restow the S-folded
bridle to make the length of free bridle at
least 5 feet (1.5m), maximum 6 feet (1.8m)
long.
5
. S-fold the length of free bridle on top of
#1 and #2 kicker flaps from right to left up
to the base of the pilot chute.
6
. Thread the pull-up cord up through the
pilot chute from bottom to top.
section 3 : closing the container
Содержание V3 M-Series
Страница 1: ......
Страница 2: ...V E C T O R O W N E R S M A N U A L Page 2 ...
Страница 14: ...Page 14 V E C T O R O W N E R S M A N U A L NOTES section 1 ...
Страница 34: ...Page 34 V E C T O R O W N E R S M A N U A L NOTES section 3 ...
Страница 58: ...Page 58 V E C T O R O W N E R S M A N U A L NOTES section 4 ...
Страница 70: ...Page 70 V E C T O R O W N E R S M A N U A L NOTES section 6 ...
Страница 83: ......
Страница 84: ......