V E C T O R
O W N E R ’ S
M A N U A L
Page
• 30
If the force
necessary to close the
last two flaps seems
excessive, the loop
may be too short. Use
a scale to determine
how much force is
needed to extract the
pin; 8lb (3.6 kg) to
12lb (5.4kg) is correct.
A short loop can also
bend the reserve loop
anchor plate when
using a cranking tool.
n
ote
11
. Thread the pull-up cord through the
right side flap (Flap #4), then the left side
flap (Flap #5) in that order. Close and secure
with the temporary pin each time. Ensure
the pilot chute folds stay flat and neat.
12
. Thread the pull-up cord through the
top center flap (Flap #6).
13
. Replace the temporary pin with the
reserve pin.
If a cranking tool is
used, care should be
taken that the 22lb
(9.9 kg) pull force is
not exceeded. This is
stipulated by the FAA
FAR’s in the USA in
accordance with the
TSO.
section 3 : closing the container
Содержание V3 M-Series
Страница 1: ......
Страница 2: ...V E C T O R O W N E R S M A N U A L Page 2 ...
Страница 14: ...Page 14 V E C T O R O W N E R S M A N U A L NOTES section 1 ...
Страница 34: ...Page 34 V E C T O R O W N E R S M A N U A L NOTES section 3 ...
Страница 58: ...Page 58 V E C T O R O W N E R S M A N U A L NOTES section 4 ...
Страница 70: ...Page 70 V E C T O R O W N E R S M A N U A L NOTES section 6 ...
Страница 83: ......
Страница 84: ......