Ensure all ball lock pins are fully engaged
into their respective holes
Ensure all quick release knob/bolts on trap
Plates and beam are hand tight and secure
Ensure upright is bolted using top and
bottom fixing holes on trap plate
Ensure gantry is level
23
PORTA
GANTRY
RAPIDE
Close trolley plate encapsulating the beam and re-
insert ball-lock pin
Ensure pin is properly engaged through holes
If trolleys are required to be locked into position then
an additional pin is available to provide trolley lock-off
Take weight of gantry upright
Remove bolts and adjust to the desired height
Re-insert bolts and hand tighten quick release
knobs ensuring the gantry is secure
To increase height pull foot down until desired
position is achieved
Remove pin
Open trolley and present to beam with plate
rotated through 90°
10
11
12
9
Never adjust the height while the gantry is under load.
Ensure the upright is bolted using top
and bottom fixing holes on Trap Plate.
Never adjust the height while the gantry is under load.
Be careful not to allow plate to swing open uncontrolled.
Pre-lift checks
Foot Adjustment
Master-link / Close-Coupled Trolley Installation
Height Adjustment
Repeat steps 1-4 for lower A-Frame
Scissor upper A-Frame until ball-lock pin is
adjacent to beam
Remove ball-lock pin and continue scissor motion
until stops engage beam and holes are aligned
Repeat steps 6 and 7 for opposite A-Frame
Re-insert ball-lock pin into hole ensuring the pin
is fully engaged through hole. A gentle rocking
motion can be used to induce alignment
5
6
7
8
Assembly Instructions
Be careful not to trap hands between beam and cheek plates!
If fitted, ensure castor brakes applied before lifting a load.
Continue the rotation of the A-Frame until it
comes to rest on ground
4
Содержание PGR1TM20
Страница 1: ...REIDLIFTING COM Assembly Operation Guide PORTAGANTRY RAPIDE...
Страница 20: ...39 PORTAGANTRY RAPIDE Notes Notes...