F
D
E
Place retaining pin into holes, F
Observe pin is securely engaged
Fall Arrest Block Installation
Present the fall arrest block to the Upright as
shown and ensure it is aligned with the holes
21
Insert the retaining pins to secure in place on the
Upright
22
27
PORTA
GANTRY
RAPIDE
Remove bolt and handle
Store handle in safe place
Move A-Frame assembly to required position
Re-insert bolt and hand tighten quick release knob
Complete assembly of gantry as steps 6-8
Beam Width Adjustment
Beam width adjustment can take place during steps 4 or 5
For coarse adjustment in leg height set cartridge
at desired point (2x50mm increments)
The foot option can be changed by removing the
ball lock pin and withdrawing the foot cartridge
assembly
Changing the Foot Option
Adjustable Foot Option
For fine height adjustment depress lever and
push foot up to desired position
Observe gantry is level
Never adjust the height while the gantry is under load.
Assembly Instructions
Place winch onto locating pin, D
Rotate winch to align holes, E
Winch Installation
Illustration shows one example of many winches,
fall arrests and interface brackets available.
Thread rope through cheek plates and capture
rope between sheave and beam
Secure sheave with ball-lock pin
Observe pin is securely engaged
Present sheaved trolley to underside of beam
Capture rope between sheaved trolley and beam
and insert pin as shown
Sheave Trolley Installation
Insert second pin as shown
Observe both pins are fully engaged
26
27
29
28
30
20
20a
23
24
25
Содержание PGR1TM20
Страница 1: ...REIDLIFTING COM Assembly Operation Guide PORTAGANTRY RAPIDE...
Страница 20: ...39 PORTAGANTRY RAPIDE Notes Notes...