PORTA
GANTRY
RAPIDE
1000kg
| Fall Protection Anchor Ratings
F = Maximum Rated Force
* Set up is indicative
Winch or SRL
position
on trap plate
PGR 1000
Product Code
Anchor Point ‘A’
Anchor Point ‘B’ Anchor Point ‘C’
Max No. Users
PGR1TS20J
15 kN
15 kN
15 kN
3
PGR1TS30J
15 kN
15 kN
15 kN
3
PGR1TS40J
15 kN
15 kN
15 kN
3
PGR1TM20J
15 kN
15 kN
15 kN
3
PGR1TM30J
15 kN
15 kN
15 kN
3
PGR1TM40J
15 kN
15 kN
15 kN
3
PGR1TT20J
15 kN
15 kN
15 kN
3
PGR1TT30J
15 kN
15 kN
15 kN
3
PGR1TT40J
15 kN
15 kN
15 kN
3
All trollies and sheave carriers are rated for one user.
17
PORTA
GANTRY
RAPIDE
Fall Protection Applications
The following information is based on REID
Lifting’s recommendations and does not remove
the responsibility of the user to comply with the
relevant regulations and standards that are valid
in the respective countries and regions where the
system is being used.
Regular Inspections
To ensure that the product’s frame remains
in safe working order it must be inspected
regularly by a competent or qualified person.
We recommend inspections every 6 months
for personnel lifting and every 12 months for
goods only, unless local regulations, adverse
working conditions or profile of use and risk
dictate shorter periods. The components of
the system need to be checked for damage,
wear, corrosion or other irregularities. It may be
necessary to disassemble the system in order
to do this. Particular attention should be paid
to checking the profiles for denting, pins and
fixings for integrity, making sure there is no wear
or elongation on the bolt holes and ensuring that
the trolley moves freely along the beam.
It is recommended that once inspected or
repaired, the device is marked with the date of
the next inspection.
Inspections are instigated by the user. If detailed
information is required on inspection and test
criteria, please contact your supplier’s technical
department or REID Lifting. The equipment
Inspection Record is on page 35.
If using the product in explosive atmospheres,
see additional section titled ATEX.
Maintenance & Repair
In order to ensure correct operation, the
conditions for inspection and maintenance must
be complied with. If any defects are found, stop
using the product immediately.
No alterations or additions to the equipment
beyond the replacement of standard parts by
an authorised representative should be made
without the written consent of the manufacturer.
Any necessary repairs identified during
inspections should only be carried out by an
approved specialist workshop using original
spare parts. Any repair must be carried out in
accordance with the manufacturer’s instructions.
It is recommended to maintain the equipment in
a clean and dry manner. Cleaning is suggested
using a sponge or cloth with warm, soapy water,
rinsing and allowing to dry.
This product must be assembled using metric
fixings of the same type and quality as those
supplied by the original manufacturer only.
Failure to do so could have an impact on the
structural performance and stability of the
product. REID Lifting and its resellers can supply
these spare parts locally.
Storage & Transportation
When transporting the components, take note of
all the manual handling considerations.
Do not throw the product down or stack any
items on top of it.
Always place carefully and security on the
ground to avoid damaging the equipment.
Inspection & Maintenance
Содержание PGR1TM20
Страница 1: ...REIDLIFTING COM Assembly Operation Guide PORTAGANTRY RAPIDE...
Страница 20: ...39 PORTAGANTRY RAPIDE Notes Notes...