City Series CB72EPV
|
69
installation
919-851a
01.30.19
5
CV72EPV / CB72EPV
Gas Power Vent Installation--wiring the power vent to the unit
1. Remove exterior side panels and bottom panels (if installed) to gain access
to junction box (Diagram 1). Note: only need to remove bottom panel on
the CB72EPV.
BX cable through strain relief
Remove 2 Panels
CV72EPV
Remove 1 Panel
CB72EPV
2. Remove access panel by lifting panel up and out (Diagram 2). Unscrew 1
x Phillips head screw to gain access to junction box (Diagram 3).
3. Strip 24" of BX exposing wires then Run BX through strain relief on right
side of the unit into junction box (Diagram 4 & 5).
Note:
The ground wire must stay out of the junction box as this will be attached
later. Only the 4 colored wires go into the junction box.
4. Join Powervent and BX cable wires together by firstly splicing 1" off wires--
join black to black, white to white (Diagram 6).
5. Join the Pressure switch and BX cable wires by splicing 1" off wires--join
red to red and blue to blue (Diagram 7).
6. After the Power and Pressure switches have been connected, place wired
connections into junction box and screw the junction cover plate back in place.
7. Make ground connection by releasing front right glass gasket pad by
turning clips counter clockwise (3 total) this will release front right glass
gasket pad (Diagram 8).
Remove Access
Panel
Remove 1 Screw
Strain relief
Glass gasket pad
Diagram 1
CV72EPV shown
Diagram 5
Diagram 6
Diagram 7
Diagram 8
Diagram 2
Diagram 3
Diagram 4
Gas Power Vent Installation - Wiring the Power Vent to the Unit
Содержание City CB72EPV-LP
Страница 113: ...City Series CB72EPV 113 notes ...
Страница 118: ...118 City Series CB72EPV ...
Страница 119: ......