UM-0206(1)
36 | P a g e
5
Handling & Storage
5.1
Stock Inspections
These guidelines are for the stocking of new units and parts before they are put into service. They are not
applicable to units and parts that
have already been put into service.
Stock
Part
Recommended Storage actions
In Stock
Inspection
Stock Release
Inspection
Certification/ Marking
Personnel
Transfer
Carriers
▪
Remove lifting assembly
▪
Place lifting assembly into
clean, dry storage
▪
Chock unit off feet.
▪
Store in a secure area away
from the risk of damage.
▪
Cover and protected from
exposure to environment
elements.
Thorough
examination (Visual
Inspection):
Every 12 months
Thorough
examination
(Examination)
Greater than 5 years
in storage: Load test
and Thorough
examination
(Examination)
▪
Thorough examination date to be stamped on
inspection plate;
▪
Thorough examination checklist to be completed;
▪
Report of Thorough Examination to be issued.
Wire rope
lifting
assembly
Store off the ground in clean, dry,
and ventilated storage area with
any lifting assembly cover
removed.
Thorough
examination (Visual
Inspection): Every 6
months
Thorough
examination
Greater than 2 years
in storage : Discard
Report of Thorough Examination to be issued.
Other
stock
parts
Store in clean, dry storage.
None
Thorough
examination
Not required
Note:
When a carrier first enters service, the “
In-service date
”
should be stamped onto the unit
’s Data
Marking Plate. (see section 4.8 for location)
At this date the examination and service-life for XT begins.
Содержание FROG-XT Series
Страница 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Страница 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Страница 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Страница 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Страница 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Страница 49: ...UM 0206 1 48 P a g e...