UM-0206(1)
19 | P a g e
3.10
Lifting Assembly Connection
–
XT10
Figure 6 Lifting Assembly
–
XT10
Lifting assembly is fitted to FROG-XT10 by
initially lowering it through the letter box
openings at the top of the carrier.
As there are two pairs of legs, one pair
needs to go into each of the letterbox
openings at the top of the unit.
The
main leg
(highlighted in red) fitted with a
bow shackle connects to the centre hole on
each load plate.
The
backup leg
(Highlighted in blue) fitted
with a spelter socket connects to the outside
hole.
The remaining two holes towards centre of
unit are used for handling.
Содержание FROG-XT Series
Страница 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Страница 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Страница 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Страница 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Страница 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Страница 49: ...UM 0206 1 48 P a g e...