UM-0206(1)
32 | P a g e
Frog XT Inspection checklist form (Page 1/3)
Unit Serial Number
Inspection date
Inspection Type
(tick one)
Installation / Vessel
Inspected by
Visual Inspection (V)
No of Transfers / Year
Company
Examination (E)
Usage Category
Job/ Ref Number
Post Load Test Inspection (P)
No. Part/ Assembly
V
E
P Action
Comment on
Action / Condition
Information/
Measurement
1
Structural Load Path
1.1
Lifting Assembly
Critical Part
Periodic Replacement*
✓
✓
-
Record unique ID number and any colour code. Confirm date installed:
Lifting Assembly should not be used for more than 12 months.
ID No:
Colour Code:
Date Installed:
✓
✓
-
Inspect master link and upper terminations;
Remove cover, inspect the full length of wires and lower terminations;
Inspect shackle and socket, ensure safety bolt and pins are secure.
1.2
Load Plate(s)
Critical Part
✓
-
✓
Visually inspect in-situ for signs of wear, cracks, or other damage. Record
ID No.
ID No:
-
✓
-
Remove and visually inspect for signs of wear, cracks, or other damage.
1.3
Load Plate
Safety Bolts
Critical Part
Periodic Replacement*
✓
-
✓
Visually inspect in-situ Load Plate Safety Bolts, nuts, split pins and seals
that connect the load plate to the central columns for wear or damage.
Record colour code.
Colour Code:
Bolt Torque:
-
✓
-
Remove and visually inspect for any signs of damage or strain.
Visually inspect the holes in the central columns for signs of damage or
strain. Ensure correct
bolt torque 140 Nm
for re-installation
**
1.4
Columns
Critical Part
✓
✓
✓
Visually inspect in-situ for any signs of wear, cracks, or other damage.
-
1.5
Node Plates
Critical Part
✓
✓
✓
Visually inspect in-situ for signs of wear, cracks, or other damage. Record
ID No.
ID Nos:
1.6
Node Plate
Safety Bolts
Critical Part
Periodic Replacement*
✓
-
✓
Visually inspect in-situ bolts, nuts, split pins and seals that connect the
Node plate to the central columns for wear or damage. Record colour
code.
Colour Code:
Bolt Torque:
-
✓
-
Remove and visually inspect for any signs of damage or strain.
Visually inspect the holes in the node plate for signs of damage or strain.
Ensure correct
bolt torque 50 Nm
for re-installation
**
It is recommended to remove, inspect, and replace one bolt at a time.
-
*Periodic Replacement Parts:
Replace according to usage per Examination Schedule section in this user manual, or on the recommendation of Competent Person.
** Bolt torques
- Check RA0122 in Product Identification Drawings for most up-to-date torque settings.
Содержание FROG-XT Series
Страница 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Страница 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Страница 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Страница 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Страница 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Страница 49: ...UM 0206 1 48 P a g e...