UM-0206(1)
31 | P a g e
4.11
Frog XT Inspection
For inspection, the Frog XT can be grouped into four assemblies, colour-coded below:
Figure 13 FROG-XT Assembly Groups
Parts on the Structural Load Path, including Wire Rope Lifting Assembly, are deemed
Critical Parts
.
Any damage or deformation to these parts may constitute a high safety risk,
hence these parts should be under high scrutiny during inspection. Some of these parts are
subject to regular recommended replacement and testing within the assembly.
The Wire Rope Lifting Assembly is the most safety-critical and vulnerable component in the
whole Frog XT assembly. It is vulnerable to damage from handling and operations and
susceptible to corrosion from sea spray and moisture build-up. The lifting assembly should
be inspected by a competent person prior to every use.
The inspection checklist below is set out in the order defined above.
Reference should be made to relevant
Identification Drawings
and
Inspection and
Maintenance Manuals
for the specific product, provided with the product, or available on
request at
1
Structural Load Path.
CRITICAL PARTS
2
Seating & Harness Assembly.
3
Damping System & Landing Feet.
4
Framework & Buoyancy.
Note:
Frog XT10 (shown here) has two Load
Path, Seating Assembly, and Damping Systems.
XT4 and XT6 have one of each assembly.
Содержание FROG-XT Series
Страница 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Страница 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Страница 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Страница 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Страница 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Страница 49: ...UM 0206 1 48 P a g e...