UM-0206(1)
12 | P a g e
3.4
Deck Crew Instructions
Briefings
Deliver passenger briefings prior to every transfer lift and contain the following information:
i.
Location specific instructions;
ii.
Potential hazards;
iii.
Loading and unloading procedures;
iv.
Seating position;
v.
Emergency procedures.
Other Responsibilities
i.
Highlight potential hazards to passengers e.g. trip hazards during entry/exit;
ii.
Remain alert from any hazards as they arise and take appropriate action;
iii.
C
heck that passengers’ harnesses are secure and correctly fitted
;
iv.
When the carrier is landed on deck, the wire rope lifting assembly may obstruct
passenger entry/exit points. Ensure passengers observe and remain clear of the wire
rope lifting assembly. It is recommended that Deck crew hold the lifting assembly in a
safe position, away from the carrier entrances.
v.
Ensure passengers keep hands clear of any pinch points, as illustrated below.
Figure 1 Pinch Points
1. Keep hands away
from the load plate
2. When folding down
the seat beware of
pinch hazard
3. Keep hands away
from the suspension
system
Содержание FROG-XT Series
Страница 1: ...USER MANUAL REV 1 UM 206 1 Issue date 13 Oct 2020 Original Instructions...
Страница 31: ...UM 0206 1 30 P a g e Figure 12 FROG 10 Pre Operational Visual Check List...
Страница 43: ...UM 0206 1 42 P a g e 7 Certificates 7 1 EC Attestation of Conformity Frog XT4...
Страница 44: ...UM 0206 1 43 P a g e 7 2 EC Attestation of Conformity Frog XT6...
Страница 45: ...UM 0206 1 44 P a g e 7 3 EC Attestation of Conformity Frog XT10...
Страница 49: ...UM 0206 1 48 P a g e...