Commissioning
32 — English
Reflexomat with Basic controller — 20.06.2017 - Rev. C
7
Commissioning
Note!
Confirm that installation and start-up have been carried out correctly using the installation, start-up and maintenance
certificate. This action is a prerequisite for the making of warranty claims.
– Have the Reflex Customer Service carry out commissioning and the annual maintenance.
7.1
Checking the requirements for commissioning
The device is ready for commissioning when the tasks described in Chapter Installation have been concluded. Comply with the following
instructions for commissioning:
•
The control unit is connected to the primary tank and the secondary tanks, if provided.
•
The water connections of the tanks to the facility system are established.
•
The tanks are not filled with water.
•
The valves for emptying the tanks are open.
•
The facility system is filled with water and gas-vented.
•
The electrical connection has been created according to applicable national and local regulations.