
8
PowerMast by ReechCraft
LIST OF TABLES
1.0 System Specifications ............................................................................................. 15
1.1 Wall-tied System Configuration ............................................................................. 16
1.2 Freestanding System Configuration ...................................................................... 18
2.0 Example Layout Plan .............................................................................................. 21
2.1 Ground Preparation ................................................................................................ 21
2.2 Wall-tied System Requirements ............................................................................. 22
4.0 Drill and Electrical Cord Specifications ................................................................. 39
LIST OF FIGURES
1.0 Wall-tied System Configuration - Single Mast/Twin Mast ....................................10
1.1 Freestanding System Configuration - Single Mast/Twin Mast .............................10
1.2 Climbing Unit ...........................................................................................................11
1.3 Wall-tied System Base ............................................................................................ 12
1.4 Freestanding System Base ..................................................................................... 13
1.5 Platform Support Assembly .................................................................................... 13
1.6 Wall-tied System Assembly ................................................................................... 14
1.7 Tri-mast Tie .............................................................................................................. 14
1.8 Wall-tied System Configuration ............................................................................. 17
1.9 Freestanding System Configuration ...................................................................... 19
2.0 Wall-tied System Configuration Examples ........................................................... 22
2.1 Loading the Mast ..................................................................................................... 22
2.2 Extending the Mast ................................................................................................. 23
2.3 Securing the Base ................................................................................................... 23
2.4 Connecting the Masts ............................................................................................. 23
3.0 Fastening the Tie to the Mast ................................................................................. 24
3.1 Anchoring the Tie to the Wall .................................................................................. 25
3.2 Erecting the Base Unit ............................................................................................ 26
3.3 Assembling the Platform Support ......................................................................... 26
3.4 Positioning the Platform Support .......................................................................... 27
3.5 Attaching the Platform to the Supports - Single Mast ......................................... 28
3.6 Attaching the Platform to the Supports - Twin Mast ............................................ 28
3.7 Securing the Platform ............................................................................................. 29
3.8 Connecting the Masts ............................................................................................. 30
3.9 Fastening the Ties .................................................................................................... 31
3.10 Stacking the Masts ................................................................................................. 31
3.11 Anchoring the Upper Tie ........................................................................................ 32
3.12 Staggering the Ties for Maximum Working Height .............................................. 33
3.13 Outrigger Footprint ................................................................................................ 34
3.14 Leveling the Base .................................................................................................... 34
3.15 Spacing the Ties ...................................................................................................... 35