www.reechcraft.com/PowerMast
888-600-6160
33
secti
On
Setting the Outriggers
Adjust the position of the outriggers to create the footprint shown below.
Fig. 1.13
Leveling the Base
Using a 4 ft level, adjust the stabilizers on the outriggers until the base is
level front to back and side to side. With the base level, lower the two center
stabilizers so they rest on the ground.
Fig. 1.14
Important:
This is the normal position the outriggers should be in to
achieve the full ratings of the system. Consult your dealer or ReechCraft
customer service for information on alternative configurations.
Important:
The main base is designed to carry the majority of the machine
weight and duty loads. The outriggers are designed to stabilize tipping
loads. It may be necessary to adjust the stabilizers slightly after full setup to
add more preloading on the stabilizers.
101 in.
75 in.
1
1
2
ERECTING THE SYSTEM: FREE-STANDING BASE SPECIAL INSTRUCTIONS
3