by ReechCraft
40
secti
On
POwER SYSTEM INSTALLATION
4
9. Repeat steps for each climbing unit.
10. Be sure that the electrical power cords are disconnected from the power
source before attempting to connect the drills to the cords. Be sure the drill
triggers are NOT locked in the ON position. Using appropriately sized
electrical cords (Fig. 4.0) connect the drills together into 1 circuit. Be sure
to properly manage the cords by securing them to the platform system
(Fig. 4.4). Eliminate any conditions which would allow the electrical cords
to catch on clothing, tools, materials or any other obstruction.
POWER CORD INSTALLATION
Fig. 4-5
11. Ensure that the cords are fastened together and joints won’t disconnect
during operation. Ensure there is sufficient cord for the full height of travel
and that the electrical cords will hang vertically down to the ground, without
interfering with the PowerMast System climbing units or work platform.
Protect all cords from any sharp edges or locations that could cause wear or
damage to the cords in any way.
Fig. 4-4
Optional cord
management
suggestion