by ReechCraft
24
secti
On
4. Loosen bolts so tie arms adjust freely.
5. Anchor tie to structure. Adjust tie vertically if necessary.
6. Move mast to desired position and tighten extension tube bolts.
7. Fully secure every bolt connection on tie before proceeding.
ERECT BASE UNIT (CONT’D)
Fig. 3.5 Anchor Tie to Wall
While anchoring,
tie arms should
telescope freely.
Tie
MUST
be anchored
to structure securely
using pull out force
according to Fig 2.2
3
ERECTING THE SYSTEM