9
Fig. 6
3.0 FIRST INSTALLATION, UNLOADING THE MACHINE FROM THE
PALLET
To remove the pallet and place the machine on the floor horizontally, follow the instructions
below:
(fig. 6)
!! NEVER CRAWL UNDERNEATH THE MACHINE !!
1. Take all unattached parts from the pallet and machine.
2. Remove the supports 1 out of the hopper.
3. Secure a hoisting cable to the lifting points.
Ensure that the cable / crane / lift can lift at least twice the weight of the
machine (see section 1.0 technical data, to obtain information about weight).
4. Slightly lift the machine to take the load off the pallet so that the bolts 3 can be unscrewed.
5. Remove the pallet supports 4.
6. Move the lowest pins 5 into the most forward position.
7. Lift the machine further so that the supports 1 can be mounted to the pins 5&6 and secure
with the corresponding clips (both sides of the machine).
8. Lift the machine further so that the rear wheels have lowered sufficiently to enable mounting
the locking pins 2 in hole 7. Secure with the corresponding clips (both sides of the machine).
!! WARNING! MAINTAIN A SAFE DISTANCE AS THE MACHINE MAY START TO
SLIDE !!
9. Remove the pallet 8 from underneath the machine.
10. Carefully and slowly lower the machine until its full weight is on the floor.
11. Remove the hoisting cables.
Содержание Vibra-Sandmaster 1600
Страница 10: ...10 Fig 7...
Страница 23: ...23 14 0 LUBRICATING POINTS Fig 13...