background image

 

 

14

5.4  ABRIDGED MAINTENANCE SCHEDULE PTO 

 
Periodic maintenance: 
 

  Grease the lubricating points every 80 operational hours or after a long period of 

inactivity. 

  Check the PTO for any damage to the safety guards and replace these if they are no 

longer sound. 

  Check that the safety stickers are in place on the PTO and are not damaged. 

 

Annual maintenance: 
 

  Remove the PTO from the machine. 

  Inspect the PTO parts. 

  Arrange all parts and carefully inspect them. 

Replace any damaged or worn parts. 

  Clean all grip connections between parts. 

  Reassemble all parts. 

  Grease both tubes and reassemble both PTO parts. 

  Reassemble the PTO and fit it to the machine. 

 

See the manual supplied with the PTO for additional information about maintenance and 
dismantling the PTO. 

 

 

The gearbox may be exposed to a higher load if the PTO has been shortened 

 

 

incorrectly or another tractor is used. This can cause damage. 

 

Содержание Vibra-Sandmaster 1600

Страница 1: ...r manual Kwekerijweg 8 3709JA Zeist The Netherlands T 31 306933227 F 31 306933228 E verti drain redexim com www redexim com NOTE IN THE INTERESTS OF SAFETY AND ACHIEVING THE BEST RESULT IT IS VERY IMP...

Страница 2: ...back in order to process any future claims This user manual contains numerous instructions which are numbered in sequence This working sequence must be adhered to The pictogram indicates safety instru...

Страница 3: ...Sandmaster in combination with the correct tractor as defined in the technical data 3 All persons appointed by the owner as authorised to operate perform maintenance on or repair the Vibra Sandmaster...

Страница 4: ...r manual the prevailing safety standards and Occupational Health and Safety regulations must be observed The governing procedures of the traffic regulations apply to use on public highways Transport o...

Страница 5: ...ity of the pulling vehicle Wear appropriate clothing Wear steel toecap safety shoes long trousers secure long hair and do not wear loose clothing Fig 5 7 Locations of safety stickers Fig 5 Used oil gr...

Страница 6: ...VIBRA SANDMASTER WITH MACHINE NUMBER AS STATED ON THE MACHINE AND IN THIS MANUAL to which this declaration refers complies with stipulation of the 2006 42 EC machine directive and is in conformity wi...

Страница 7: ...O 13 5 3 PTO INFORMATION AND MAINTENANCE 13 5 4 ABRIDGED MAINTENANCE SCHEDULE PTO 14 6 0 CONNECTING TO THE TRACTOR 15 7 0 WORKING DEPTH ADJUSTMENT 16 7 1 SETTING LIFTING LOWERING ORDER 17 7 2 SETTING...

Страница 8: ...2516 4 26x2 26x2 10mtr 167 7 x89 x82 7 Hopper loading height 2 1m 82 7 Elevated machine 1 5m 59 Deepest operating position Hopper capacity 1 5m3 Hydraulic connection value 1 single operating valve El...

Страница 9: ...machine to take the load off the pallet so that the bolts 3 can be unscrewed 5 Remove the pallet supports 4 6 Move the lowest pins 5 into the most forward position 7 Lift the machine further so that t...

Страница 10: ...10 Fig 7...

Страница 11: ...t the Verti Quake is properly supported that the support can carry the load of the machine and that the unit as a whole is stable before continuing to the next step 9 Disconnect the Verti Quake from t...

Страница 12: ...r to the tractor as described in section 6 2 Switch the tractor off and ensure that the tractor is properly blocked and cannot move position independently 3 Lower the Vibra Sandmaster to the floor unt...

Страница 13: ...d the system is used and maintained correctly the slip coupling will protect the machine against damage The following items are important 1 By default the length of the spring is set at 33 mm 1 3 2 If...

Страница 14: ...ntenance Remove the PTO from the machine Inspect the PTO parts Arrange all parts and carefully inspect them Replace any damaged or worn parts Clean all grip connections between parts Reassemble all pa...

Страница 15: ...ye 5 of the desired height of the traction pin of the tractor Important to adjust the height of the hitch so that the skid 6 hits the soil and still pressure on the hitch point of the tractor can be a...

Страница 16: ...fore getting off the tractor 3 Set the operating depth of the Verti Quake see the Verti Quake manual for the procedure 4 Set the operating depth of the Sandmaster approx 25mm 40mm 1 1 6 less deep than...

Страница 17: ...into the ground first so that it can pre cut the grooves after which the vibrating filling coulters follow The lowering order and speed can be set by rotating the chokes 5 rear and 6 front Clockwise s...

Страница 18: ...conveyor Fig 11 The speed of the conveyor can be adjusted by rotating choke 2 at the side of the hopper Clockwise slower Anti clockwise faster Practical experience shows that the supply can be contro...

Страница 19: ...tpone the use of the Vibra Sandmaster 7 If the surface is frozen or extremely wet postpone activities until conditions improve 9 0 OPERATING SPEED The effectiveness of the treatment is determined by t...

Страница 20: ...approx 1200 rpm and engage the PTO 9 Increase the speed to 300 RPM 10 Put the tractor into motion and smoothly lower the Vibra Sandmaster into the ground 11 Increase PTO speed to a maximum of 540 rpm...

Страница 21: ...actor in the following manner see Fig 12 1 Drive the Vibra Sandmaster to a storage area with a stable level surface Ensure that that tractor is properly blocked and cannot move independently Switch th...

Страница 22: ...0 Adjust operational depth Adjust operational depth Adjust speed Increase PTO rpm Machine wants to push tractor forward Tractor too light No four wheel drive Tractor slips due to insufficient pressure...

Страница 23: ...23 14 0 LUBRICATING POINTS Fig 13...

Страница 24: ...pressure washer is used After the first 20 operational hours new or repaired Grease all lubricating points see section 13 0 Check the roller bearings and the drive line Check for any damage to the hyd...

Страница 25: ...r side of the machine 3 Remove pin 5 on both ends of the machine and let the slider feet rotate downwards 4 Remove the bolts 3 and nuts 4 5 Remove the filling coulters to be replaced Take care The bla...

Страница 26: ...on the floor and that it cannot subside or slide 1 Unscrew the nuts 1 2 Adjust the roller by tightening or loosening the nuts 1 3 Adjust the roller on the other side of the hopper by the same margin 4...

Отзывы: