Refer to the included OEM SunGrow manuals for additional details on the operation of each of the individual 
components. 

Pre-start-up Procedures: 

With the lid removed confirm the following; 

1.

 

AC cables are connected into the inverter to the correct terminals of the terminal block. 

2.

 

The system is correctly earthed, either via the customer’s local earth or through a locally installed earth 

stake. 

3.

 

The PV cables are connected to the DC Isolator, and the polarity is correct. 

4.

 

The battery terminal connections are correct. (if batteries are included in the system) 

Start-up the battery in the SunRise system: (if batteries are included, otherwise skip this section) 

LG Battery 

1.

 

Once cables are properly connected, ensure all breakers (AC and DC MCBs) are turned off. 

2.

 

Press and hold the power button on the Master LG battery (whichever has the blue communication cable 

plugged into it. All other LG batteries will turn on. After less than a minute they will finish their start-up 

procedure and indicate their current state-of-charge. The table below describes the lights that will be 

shown on the LG batteries during start-up.  

STEP 5: Starting up the Sunrise System: 

Содержание SunRise 1-PH

Страница 1: ...SunRise Home Battery System Model SGS 1 PH AUTO with LG BYD battery Installation Manual...

Страница 2: ...16 5kWh Each battery weighs 24kg Dimensions 104 cm H x 97 cm W x 54 cm D Safety Instructions Physical Specifications WARNING Installation and Maintenance of the Sunrise System should only be done by a...

Страница 3: ...old loads fridges lights etc can be powered during a power outage This uses an automatic transfer switch included inside the SunRise unit When installed without batteries excess PV generated during th...

Страница 4: ...imum of 6 65kW of panels and maximum PV string voltage of 600VDC 4 Optional Cat5E internet cable to provide more reliable comms for remote monitoring WiFi is included in the system as default In addit...

Страница 5: ...ing the maximum 5 x 6 5kWh LG M48 batteries The 2nd image shows the SunRise SGS without the batteries in place Note The Sunrise is delivered with the inverter inside but without the batteries inside t...

Страница 6: ......

Страница 7: ...The internal wiring layout is shown below The right side of the SunRise system includes the AC and DC Switch assemblies the left side allows access to the control panel of the inverter...

Страница 8: ...their solar inverters and removes the requirement to add AC and DC Isolators on the wall next to the system The system is supplied without the batteries installed This allows the enclosure to be more...

Страница 9: ...er induction including system monitoring using the Sungrow app on their phone if possible Apply appropriate labels in on MSB see included SunRise Signage Overview document Complete a commissioning rep...

Страница 10: ...f 5 x 3 3 kWh batteries Other battery options can be ordered including BYD and Troppo batteries 3 1 x Parts Kit containing all parts to complete the installation of the SunRise battery system in a nor...

Страница 11: ...from the top 2 Wall mount The system can also be wall mounted using standard heavy duty airconditioning mounting bracket available from RedEarth These images show a SunRise system installed on a wall...

Страница 12: ...LG battery cables KEEP SAME LENGTH AS SUPPLIED BY Redearthng up the FPA3 The diagram below shows an overview of the electrical connection inside the SunRise System STEP 4 Wiring up the Sunrise...

Страница 13: ...cables to the PV isolator inside the SunRise 4 Optional Cat5E internet cable to the SunRise otherwise use Wi Fi Note All isolators and MCBs are included in the Sunrise so no wall mounted isolators are...

Страница 14: ...f energy available is limited to the battery capacity and the solar contribution during the daytime The Parts Kit contains a 25A 2 pole MCB to isolate the Inverter Grid Solar and Essential EPS circuit...

Страница 15: ...at right shows where to connect the cable in position 3 o Optional Remote Earth Fault Alarm Terminals are provided inside the SunRise system that provide 230Vac in the case of an Earth Fault These can...

Страница 16: ...ries They are installed in the Bus bars provided and shown at right b Install the batteries with the battery terminals towards the front of the unit The batteries are lowered directly onto the battery...

Страница 17: ...he battery terminal connections are correct if batteries are included in the system Start up the battery in the SunRise system if batteries are included otherwise skip this section LG Battery 1 Once c...

Страница 18: ...attery has completed start up which takes 1 minute the indicators as shown below will be on For LG battery Trouble shooting refer to pp31 of the LG Installation manual which has been included with you...

Страница 19: ......

Страница 20: ...itself if you do not want to connect via your phone and Local Mode To access the control panel remove the vent on the left side of the system as shown here o Work through the settings on the SunGrow...

Страница 21: ...e ordered from RedEarth together with the required communication and battery cables The procedure to add extra battery modules is outlined below The LG battery must be shut down to add modules Note th...

Страница 22: ......

Страница 23: ...gency Power Supply AC POWER EPS rated Power from battery only 3000VA EPS rated Power with PV support 5000VA Changeover time to EPS when outage occurs 3 sec Max Charging current 65A Max Discharging cur...

Страница 24: ...l Voltage 51 2 Vdc Lithium ion chemistry LiFePO4 OPERATING CONDITIONS Operating voltage 40 56 4 Vdc Max float voltage 57 4 Vdc Available operating temperature C 10 50 C Certification UL1642 IEC62619 S...

Страница 25: ...ons Miscellaneous spare parts o HD Air con bracket set with additional bolts o 4 core cable 3C E in 10mm2 and 16mm2 o Optional remote earth fault alarm 230Vac 3G 4G dongle if no customer internet is a...