BMS communication cable from the
inverter to the Master battery. This cable is
already connected inside the Sungrow
inverter. The other end needs to be plugged
into the Master LG battery. Additional LG
batteries are then connected using the
inter-battery 10-pin lead provided with
each additional battery (black with yellow
ends). Note: 3.3 and 6.5kWh batteries
cannot be mixed.
o
Plug the DC battery cables into the correct
terminals on the LG batteries. The battery is
now ready to be turned on.
5.
(b) or Install the BYD batteries.
a.
First connect the additional DC battery cables
to the battery bus bars (if extra batteries
were ordered). These are provided with the
batteries. They are installed in the Bus bars
provided and shown at right.
b.
Install the batteries with the battery
terminals towards the front of the unit: The
batteries are lowered directly onto the
battery rails in the system. Position the
Master battery (1
st
battery) on the right of
the system, away from the inverters.
c.
BMS communication cable from the BYD
BMU to the Master battery. This cable is
already connected inside the BMU. The other
end needs to be plugged into the Master BYD
battery. Additional batteries are then
connected using the inter-battery lead
provided with each additional battery.
d.
Set the Red DIP Switch to number each
battery incrementally from 1 to 4.
e.
Plug the DC battery cables into the correct
terminals on the batteries. The battery is now
ready to be turned on.
6.
Once the wiring described above is completed the system is ready for Start-up.