If remote monitoring is required, is there internet available? Wi-Fi or hard-wire option? RedEarth can assist 

with 3G/4G options if required. 

 

Confirm it is a single-phase house. Note that RedEarth has another version of the SunRise system for 3-phase 

houses.  

 

Does the customer require back-up capability? If so, what is the condition of the MSB? Does it have space for 

the additional 3 poles of switches for the backup system? Do you need to replace some of the existing 2-pole 

RCDs with 1-pole RCBOs? 

 

Can the system be placed in a shaded area on or off the ground? How far is it from the MSB? What AC cable 

size is required for the distance? RedEarth can provide cable. Remember that the essential loads are 

permanently powered via the transfer switch inside the SunRise (if back-up capability is required) 

 

Is an optional remote earth fault alarm required, e.g. in the garage? 

 

 

The SunRise System is delivered in individual boxes to allow for 
easy installation on site.  

The image at right shows a SunRise system being picked up at a 
RedEarth facility in Brisbane.  

Parts supplied with the SunRise system:

 

1.

 

SunRise enclosure – pre-wired and factory tested with 

the Sungrow inverter installed. 

2.

 

1 box for each LG battery module supplied. These 

include the correct communication cable as well as pre-

terminated DC battery cables of the correct length. Up to 5 LG battery modules can be installed (maximum 

of 5 x 3.3 kWh batteries) Other battery options can be ordered including BYD and Troppo batteries. 

3.

 

1 x Parts Kit containing all parts to complete the installation of the SunRise battery system in a normal 

house. 

4.

 

1 x set of manuals including OEM documents for the LG battery and Sungrow inverter. 

5.

 

Optional – Heavy duty wall-mounting bracket set. 

6.

 

Optional – 3-Core + Earth Orange Circ cable. To connect the SunRise to the Main Switch Board with only one 

cable. 

The SunRise system can be installed either indoors (e.g. in a shed) or outdoors. The system should be installed in a 
shaded area. Note: If the system overheats it will shut down to protect itself.  

Positioning of the SunRise system:

 

Stand-off from the floor, wall and ceiling/roof:  

The SunRise System is to be installed at least 90mm off the wall to allow space for airflow from the vents and fans. It 
is designed to be placed either on a concrete base/floor or mounted on 3 heavy duty air-con brackets above the 
ground (max system weight 227kg). The mounting height of the base should not be > 50cm above the ground, to 
allow positioning of the batteries and inverters during system assembly. At least 50cm clearance is required from the 
top of the system to the roof/ceiling so that the cover can be removed, and cables checked. 

 

Distance from any heat source (e.g. hot water, air-con unit, gas heaters): >0.6m. 

 

Distance from any equipment including water taps >0.6m 

 

Clearance distances from windows and vents >0.6m. 

 

Do not block the rear vents by pushing the unit right up against a wall.  

STEP 3: Transporting, positioning and assembling the Sunrise System: 

Содержание SunRise 1-PH

Страница 1: ...SunRise Home Battery System Model SGS 1 PH AUTO with LG BYD battery Installation Manual...

Страница 2: ...16 5kWh Each battery weighs 24kg Dimensions 104 cm H x 97 cm W x 54 cm D Safety Instructions Physical Specifications WARNING Installation and Maintenance of the Sunrise System should only be done by a...

Страница 3: ...old loads fridges lights etc can be powered during a power outage This uses an automatic transfer switch included inside the SunRise unit When installed without batteries excess PV generated during th...

Страница 4: ...imum of 6 65kW of panels and maximum PV string voltage of 600VDC 4 Optional Cat5E internet cable to provide more reliable comms for remote monitoring WiFi is included in the system as default In addit...

Страница 5: ...ing the maximum 5 x 6 5kWh LG M48 batteries The 2nd image shows the SunRise SGS without the batteries in place Note The Sunrise is delivered with the inverter inside but without the batteries inside t...

Страница 6: ......

Страница 7: ...The internal wiring layout is shown below The right side of the SunRise system includes the AC and DC Switch assemblies the left side allows access to the control panel of the inverter...

Страница 8: ...their solar inverters and removes the requirement to add AC and DC Isolators on the wall next to the system The system is supplied without the batteries installed This allows the enclosure to be more...

Страница 9: ...er induction including system monitoring using the Sungrow app on their phone if possible Apply appropriate labels in on MSB see included SunRise Signage Overview document Complete a commissioning rep...

Страница 10: ...f 5 x 3 3 kWh batteries Other battery options can be ordered including BYD and Troppo batteries 3 1 x Parts Kit containing all parts to complete the installation of the SunRise battery system in a nor...

Страница 11: ...from the top 2 Wall mount The system can also be wall mounted using standard heavy duty airconditioning mounting bracket available from RedEarth These images show a SunRise system installed on a wall...

Страница 12: ...LG battery cables KEEP SAME LENGTH AS SUPPLIED BY Redearthng up the FPA3 The diagram below shows an overview of the electrical connection inside the SunRise System STEP 4 Wiring up the Sunrise...

Страница 13: ...cables to the PV isolator inside the SunRise 4 Optional Cat5E internet cable to the SunRise otherwise use Wi Fi Note All isolators and MCBs are included in the Sunrise so no wall mounted isolators are...

Страница 14: ...f energy available is limited to the battery capacity and the solar contribution during the daytime The Parts Kit contains a 25A 2 pole MCB to isolate the Inverter Grid Solar and Essential EPS circuit...

Страница 15: ...at right shows where to connect the cable in position 3 o Optional Remote Earth Fault Alarm Terminals are provided inside the SunRise system that provide 230Vac in the case of an Earth Fault These can...

Страница 16: ...ries They are installed in the Bus bars provided and shown at right b Install the batteries with the battery terminals towards the front of the unit The batteries are lowered directly onto the battery...

Страница 17: ...he battery terminal connections are correct if batteries are included in the system Start up the battery in the SunRise system if batteries are included otherwise skip this section LG Battery 1 Once c...

Страница 18: ...attery has completed start up which takes 1 minute the indicators as shown below will be on For LG battery Trouble shooting refer to pp31 of the LG Installation manual which has been included with you...

Страница 19: ......

Страница 20: ...itself if you do not want to connect via your phone and Local Mode To access the control panel remove the vent on the left side of the system as shown here o Work through the settings on the SunGrow...

Страница 21: ...e ordered from RedEarth together with the required communication and battery cables The procedure to add extra battery modules is outlined below The LG battery must be shut down to add modules Note th...

Страница 22: ......

Страница 23: ...gency Power Supply AC POWER EPS rated Power from battery only 3000VA EPS rated Power with PV support 5000VA Changeover time to EPS when outage occurs 3 sec Max Charging current 65A Max Discharging cur...

Страница 24: ...l Voltage 51 2 Vdc Lithium ion chemistry LiFePO4 OPERATING CONDITIONS Operating voltage 40 56 4 Vdc Max float voltage 57 4 Vdc Available operating temperature C 10 50 C Certification UL1642 IEC62619 S...

Страница 25: ...ons Miscellaneous spare parts o HD Air con bracket set with additional bolts o 4 core cable 3C E in 10mm2 and 16mm2 o Optional remote earth fault alarm 230Vac 3G 4G dongle if no customer internet is a...